Global BRTData

    ABOUT
  BRT
DATA

About Global BRTData

The BRTData gathers information on bus priority systems in cities around the world. The platform is source of research for academics, journalists, students and municipal technicians, as well as provides technical background for decision making regarding public transport.

The data presented contemplate BRT systems (Bus Rapid Transit - median-aligned and segregated bus lanes, pre-board fare collection, and platform-level boarding) and bus priority systems: cities with dedicated bus lanes, but without some of the elements of a BRT. The website allows the user to know the systems and corridors of each city, compare indicators and generate graphs.

The BRTData was developed by BRT+ CoE, a Center of Excellence in BRT, and by WRI, with collaboration of the Institute for Transportation and Development Policy (ITDP). The platform is monthly updated with reliable data and verified by WRI Brasil Ross Center for Sustainable Cities.

    FIND
  YOUR
SYSTEM

BY CITY

    FIND
  YOUR
INDICATOR

SYSTEM

Report

Tehran, Iran - tehran brt

 

Tehran has 8,244,535 inhabitants. 31% of total trips are made by public transport, as showed in the graph below.

 

MODAL SPLIT - TEHRAN

The city has started the system in 2008 and now counts with 10 bus priority corridors consisting of 179 kilometers and benefiting 713,696 passengers every day. The average operational speed of the system is 19 km/h.

 

SYSTEM LENGTH IN RELATION TO Iran

 

DAILY DEMAND IN RELATION TO Iran

Some technical details about corridors are presented in the table below.

 

 

Corridor NameDaily demand, corridor (passengers per day)Corridor length (km)Stations, corridorPre-board fare collection, corridorOvertaking lanes, corridorStation boarding level, corridorOperating speed, corridor
Line 1 18.5 27 All None Low-level platform
Line 2 18.5 28 All None Low-level platform
Line 3 13.5 24 All None Low-level platform
Line 4 21.5 24 All None Low-level platform
Line 5 9.5 10 All None Low-level platform
Line 7 16 36 All None Low-level platform
Line 8 40,000 7 6 All None Low-level platform
Line 10 23.5 25 All None Low-level platform
Line 6 14.5 17
Line 9 34 34

Curiosities

SYSTEM Indicators

Indicator Value Date Source
GDP per capita (US$) (General info) 2422.5 2020 databank.worldbank.org
Population, city (General info) 8,244,535 2015 Census of the Islamic Republic of Iran
Population, metro area (General info) 13,828,365 2012 Census of the Islamic Republic of Iran
Population density, metropolitan area (General info) 10,854 2012 Census of the Islamic Republic of Iran
Modal split % public transport (General info) 31 2019 Modal splits, fuel use and efficiency in the urban transport sector in... | Download Scientific Diagram (researchgate.net)
Modal split % private transport (General info) 69 2019 Modal splits, fuel use and efficiency in the urban transport sector in... | Download Scientific Diagram (researchgate.net)
Modal split % non motorized (General info) 0 2019, doesn't consider journeys made by foot Modal splits, fuel use and efficiency in the urban transport sector in... | Download Scientific Diagram (researchgate.net)
System name (System info) Tehran BRT
Corridors (System info) 10 2023 livingintehran.com
Year system commenced (System info) 2008 Tehran Bus
Transit agency (System info) Tehran Transportation and Traffic Agency 2014 trafficorg.tehran.ir
Standard fare (US$) (System info) 0.05 2012 www.tastingtravels.com
Annual fare revenue (US$ millions) (System info) 21 Calculated using annual demand and fare
Fare integration within the system (System info) Yes 2013 thecityfix.com
Citywide fare integration (other modes) (System info) Yes 2013 thecityfix.com
Integration terminals (System info) 6 2014 bus.tehran.ir
Transfer stations (System info) 10 2014 bus.tehran.ir
Peak load (passengers per hour per direction) (System info)
Daily demand (passengers per day) (System info) 713695.9 2019 Calculated using annual demand and 300 working days
Annual demand (passengers per year) (System info) 214,108,788 2019 www.unescap.org
Capital productivity (boardings per bus per day) (System info)
Operational productivity (IPK) (System info)
Operations control center (System info)
Trunk lines (System info)
Feeder routes (System info)
Depots (System info)
System length (km) (Additional Information) 178.5 2023 Calculated using the sum of each corridors' length
Position of with-flow lanes (Additional Information)
Position of counterflow lanes (Additional Information)
Position of bus doors (Additional Information)
Lane material on running ways (Additional Information)
Lane material at stations (Additional Information)
Stations (Additional Information) 231 2023 Calculated using the sum of the number of stations in each corridor
Station spacing (m) (Additional Information) 772.7 2023 Calculated using system length and stations
Pre-board fare collection (Additional Information) All 2014 trafficorg.tehran.ir
Overtaking lanes (Additional Information) None 2014 trafficorg.tehran.ir
Station boarding level (Additional Information) Low level platform 2014 trafficorg.tehran.ir
Real time information (Additional Information) All 2014 trafficorg.tehran.ir
Peak frequency (buses per hour) (Additional Information) 90 2013 en.tehran.ir
Operating speed (Additional Information) 19 2011 Tehran bus
Total fleet (System fleet) 1,240 2012 en.tehran.ir
Fleet, standard buses (System fleet) 660 2012 en.tehran.ir
Average age, standard buses (System fleet)
Propulsion, standard buses (System fleet)
Fuel type, standard buses (System fleet)
Fuel economy, standard buses (System fleet)
Fleet, articulated buses (System fleet) 580 2012 en.tehran.ir
Average age, articulated buses (System fleet)
Propulsion, articulated buses (System fleet)
Fuel type, articulated buses (System fleet)
Fuel economy, articulated buses (System fleet)
Fleet, bi-articulated buses (System fleet) 0 2014
Average age, bi-articulated buses (System fleet) N/A
Propulsion, bi-articulated buses (System fleet) N/A
Fuel type, bi-articulated buses (System fleet) N/A
Fuel economy, bi-articulated buses (System fleet) N/A
Fleet, double-decker buses (System fleet) 0 2014
Average age, double-decker buses (System fleet) N/A
Propulsion, double-decker buses (System fleet) N/A
Fuel type, double-decker buses (System fleet) N/A
Fuel economy, double-decker buses (System fleet) N/A
Typical fuel type (System fleet)
City's diesel sulfur content (ppm) (System fleet)
Total cost per kilometer (US$ million per km) (System cost)
Planning cost (US$ million) (System cost)
Capital cost per kilometer (US$ million per km) (System cost)
Infrastructure cost per kilometer (US$ million per km) (System cost)
Equipment cost (US$ million) (System cost)
Annual operational cost (US$ million) (System cost)
User rating (System image)
Brand and logo (System image) Yes 2014 trafficorg.tehran.ir
Unique bus livery (System image) Yes 2014 trafficorg.tehran.ir
Citywide annual road fatalities (System road safety) 687 2017 www.unescap.org
Citywide annual injuries (System road safety)

CORRIDOR Indicators - Line 1

Indicator Value Date Source
Corridor Name (Corridor info) Line 1 trafficorg.tehran.ir
Corridor classification (Corridor info) BRT 2017 ITDP
BRT Standard (Corridor info) BRT 2017 ITDP will do preliminary assessment shortly
Year corridor commenced (Corridor info) 2008 trafficorg.tehran.ir
Corridor service (Corridor info) Trunk lines 2014 trafficorg.tehran.ir
Peak load, corridor (passengers per hour per direction) (Corridor info)
Daily demand, corridor (passengers per day) (Corridor info)
Trunk lines, corridor (Corridor info)
Corridor length (km) (Running ways) 18.5 2023 livingintehran.com
Length of segregated lanes, corridor (km) (Running ways) 18.7 2014 trafficorg.tehran.ir
Length of segregated counterflow lanes, corridor (km) (Running ways) 0 2014 trafficorg.tehran.ir
Length of exclusive lanes, corridor (km) (Running ways) 0 2014 trafficorg.tehran.ir
Mixed traffic with-flow length, corridor (km) (Running ways) 0 2014 trafficorg.tehran.ir
Position of with-flow lanes, corridor (Running ways) Median 2014 trafficorg.tehran.ir
Position of counterflow lanes, corridor (Running ways) N/A 2014 trafficorg.tehran.ir
Position of bus doors, corridor (Running ways) Left 2014 trafficorg.tehran.ir
Lane material on running ways, corridor (Running ways) Asphalt 2014 trafficorg.tehran.ir
Lane material at stations, corridor (Running ways) Asphalt 2014 trafficorg.tehran.ir
Grade-separated intersections, corridor (Traffic engineering)
Fixed signal priority (Traffic engineering) None 2014 trafficorg.tehran.ir
Dynamic signal priority (Traffic engineering) All 2014 trafficorg.tehran.ir
Stations, corridor (Stations) 27 2023 livingintehran.com
Station spacing, corridor (m) (Stations) 685.2 2023 Calculated using corridor length and stations
Enhanced stations (Stations) Yes 2014 trafficorg.tehran.ir
Pre-board fare collection, corridor (Stations) All 2014 trafficorg.tehran.ir
Overtaking lanes, corridor (Stations) None 2014 trafficorg.tehran.ir
Station boarding level, corridor (Stations) Low-level platform 2014 trafficorg.tehran.ir
Type of bus guidance (ITS) None 2014 trafficorg.tehran.ir
Peak frequency, corridor (buses per hour per direction) (Travel time) 90 2013 en.tehran.ir
Operating speed, corridor (Travel time)
Express services (Travel time)
Speed limit (km/h) (Travel time)
Real time information, corridor (Comfort) All 2014 trafficorg.tehran.ir
Physically integrated feeders (Comfort) N/A 2014 trafficorg.tehran.ir
Total cost per kilometer, corridor (US$ million per km) (Cost)
Planning cost, corridor (US$ million) (Cost)
Infrastructure cost per kilometer, corridor (US$ million per km) (Cost)
User rating, corridor (Quality of service)
Corridor annual fatalities (Road Safety)

CORRIDOR Indicators - Line 2

Indicator Value Date Source
Corridor Name (Corridor info) Line 2 trafficorg.tehran.ir
Corridor classification (Corridor info) BRT 2017 ITDP
BRT Standard (Corridor info) BRT 2017 ITDP will do preliminary assessment shortly
Year corridor commenced (Corridor info) 2009 trafficorg.tehran.ir
Corridor service (Corridor info) Trunk lines 2014 trafficorg.tehran.ir
Peak load, corridor (passengers per hour per direction) (Corridor info)
Daily demand, corridor (passengers per day) (Corridor info)
Trunk lines, corridor (Corridor info)
Corridor length (km) (Running ways) 18.5 2023 livingintehran.com
Length of segregated lanes, corridor (km) (Running ways) 18.7 2014 trafficorg.tehran.ir
Length of segregated counterflow lanes, corridor (km) (Running ways) 0 2014 trafficorg.tehran.ir
Length of exclusive lanes, corridor (km) (Running ways) 0 2014 trafficorg.tehran.ir
Mixed traffic with-flow length, corridor (km) (Running ways) 0 2014 trafficorg.tehran.ir
Position of with-flow lanes, corridor (Running ways) Median 2014 trafficorg.tehran.ir
Position of counterflow lanes, corridor (Running ways) N/A 2014 trafficorg.tehran.ir
Position of bus doors, corridor (Running ways) Left 2014 trafficorg.tehran.ir
Lane material on running ways, corridor (Running ways) Asphalt 2014 trafficorg.tehran.ir
Lane material at stations, corridor (Running ways) Asphalt 2014 trafficorg.tehran.ir
Grade-separated intersections, corridor (Traffic engineering)
Fixed signal priority (Traffic engineering) None 2014 trafficorg.tehran.ir
Dynamic signal priority (Traffic engineering) All 2014 trafficorg.tehran.ir
Stations, corridor (Stations) 28 2023 livingintehran.com
Station spacing, corridor (m) (Stations) 660.7 2023 Calculated using corridor length and stations
Enhanced stations (Stations) Yes 2014 trafficorg.tehran.ir
Pre-board fare collection, corridor (Stations) All 2014 trafficorg.tehran.ir
Overtaking lanes, corridor (Stations) None 2014 trafficorg.tehran.ir
Station boarding level, corridor (Stations) Low-level platform 2014 trafficorg.tehran.ir
Type of bus guidance (ITS) None 2014 trafficorg.tehran.ir
Peak frequency, corridor (buses per hour per direction) (Travel time)
Operating speed, corridor (Travel time)
Express services (Travel time)
Speed limit (km/h) (Travel time)
Real time information, corridor (Comfort) All 2014 trafficorg.tehran.ir
Physically integrated feeders (Comfort) N/A 2014 trafficorg.tehran.ir
Total cost per kilometer, corridor (US$ million per km) (Cost)
Planning cost, corridor (US$ million) (Cost)
Infrastructure cost per kilometer, corridor (US$ million per km) (Cost)
User rating, corridor (Quality of service)
Corridor annual fatalities (Road Safety)

CORRIDOR Indicators - Line 3

Indicator Value Date Source
Corridor Name (Corridor info) Line 3 trafficorg.tehran.ir
Corridor classification (Corridor info) BRT 2017 ITDP
BRT Standard (Corridor info) BRT 2017 ITDP will do preliminary assessment shortly
Year corridor commenced (Corridor info) 2009 trafficorg.tehran.ir
Corridor service (Corridor info) Trunk lines 2014 trafficorg.tehran.ir
Peak load, corridor (passengers per hour per direction) (Corridor info)
Daily demand, corridor (passengers per day) (Corridor info)
Trunk lines, corridor (Corridor info)
Corridor length (km) (Running ways) 13.5 2023 livingintehran.com
Length of segregated lanes, corridor (km) (Running ways) 14.3 2014 trafficorg.tehran.ir
Length of segregated counterflow lanes, corridor (km) (Running ways) 0 2014 trafficorg.tehran.ir
Length of exclusive lanes, corridor (km) (Running ways) 0 2014 trafficorg.tehran.ir
Mixed traffic with-flow length, corridor (km) (Running ways) 0 2014 trafficorg.tehran.ir
Position of with-flow lanes, corridor (Running ways) Median 2014 trafficorg.tehran.ir
Position of counterflow lanes, corridor (Running ways) N/A 2014 trafficorg.tehran.ir
Position of bus doors, corridor (Running ways) Left 2014 trafficorg.tehran.ir
Lane material on running ways, corridor (Running ways) Asphalt 2014 trafficorg.tehran.ir
Lane material at stations, corridor (Running ways) Asphalt 2014 trafficorg.tehran.ir
Grade-separated intersections, corridor (Traffic engineering)
Fixed signal priority (Traffic engineering) None 2014 trafficorg.tehran.ir
Dynamic signal priority (Traffic engineering) All 2014 trafficorg.tehran.ir
Stations, corridor (Stations) 24 2023 livingintehran.com
Station spacing, corridor (m) (Stations) 562.5 2023 Calculated using corridor length and stations
Enhanced stations (Stations) Yes 2014 trafficorg.tehran.ir
Pre-board fare collection, corridor (Stations) All 2014 trafficorg.tehran.ir
Overtaking lanes, corridor (Stations) None 2014 trafficorg.tehran.ir
Station boarding level, corridor (Stations) Low-level platform 2014 trafficorg.tehran.ir
Type of bus guidance (ITS) None 2014 trafficorg.tehran.ir
Peak frequency, corridor (buses per hour per direction) (Travel time)
Operating speed, corridor (Travel time)
Express services (Travel time)
Speed limit (km/h) (Travel time)
Real time information, corridor (Comfort) All 2014 trafficorg.tehran.ir
Physically integrated feeders (Comfort) N/A 2014 trafficorg.tehran.ir
Total cost per kilometer, corridor (US$ million per km) (Cost)
Planning cost, corridor (US$ million) (Cost)
Infrastructure cost per kilometer, corridor (US$ million per km) (Cost)
User rating, corridor (Quality of service)
Corridor annual fatalities (Road Safety)

CORRIDOR Indicators - Line 4

Indicator Value Date Source
Corridor Name (Corridor info) Line 4 trafficorg.tehran.ir
Corridor classification (Corridor info) BRT 2017 ITDP
BRT Standard (Corridor info) BRT 2017 ITDP will do preliminary assessment shortly
Year corridor commenced (Corridor info) 2011 trafficorg.tehran.ir
Corridor service (Corridor info) Trunk lines 2014 trafficorg.tehran.ir
Peak load, corridor (passengers per hour per direction) (Corridor info)
Daily demand, corridor (passengers per day) (Corridor info)
Trunk lines, corridor (Corridor info)
Corridor length (km) (Running ways) 21.5 2023 livingintehran.com
Length of segregated lanes, corridor (km) (Running ways) 21.5 2014 trafficorg.tehran.ir
Length of segregated counterflow lanes, corridor (km) (Running ways) 0 2014 trafficorg.tehran.ir
Length of exclusive lanes, corridor (km) (Running ways) 0 2014 trafficorg.tehran.ir
Mixed traffic with-flow length, corridor (km) (Running ways) 0 2014 trafficorg.tehran.ir
Position of with-flow lanes, corridor (Running ways) Median 2014 trafficorg.tehran.ir
Position of counterflow lanes, corridor (Running ways) N/A 2014 trafficorg.tehran.ir
Position of bus doors, corridor (Running ways) Left 2014 trafficorg.tehran.ir
Lane material on running ways, corridor (Running ways) Asphalt 2014 trafficorg.tehran.ir
Lane material at stations, corridor (Running ways) Asphalt 2014 trafficorg.tehran.ir
Grade-separated intersections, corridor (Traffic engineering)
Fixed signal priority (Traffic engineering) None 2014 trafficorg.tehran.ir
Dynamic signal priority (Traffic engineering) All 2014 trafficorg.tehran.ir
Stations, corridor (Stations) 24 2023 livingintehran.com
Station spacing, corridor (m) (Stations) 895.8 2023 Calculated using corridor length and stations
Enhanced stations (Stations) Yes 2014 trafficorg.tehran.ir
Pre-board fare collection, corridor (Stations) All 2014 trafficorg.tehran.ir
Overtaking lanes, corridor (Stations) None 2014 trafficorg.tehran.ir
Station boarding level, corridor (Stations) Low-level platform 2014 trafficorg.tehran.ir
Type of bus guidance (ITS) None 2014 trafficorg.tehran.ir
Peak frequency, corridor (buses per hour per direction) (Travel time)
Operating speed, corridor (Travel time)
Express services (Travel time)
Speed limit (km/h) (Travel time)
Real time information, corridor (Comfort) All 2014 trafficorg.tehran.ir
Physically integrated feeders (Comfort) N/A 2014 trafficorg.tehran.ir
Total cost per kilometer, corridor (US$ million per km) (Cost)
Planning cost, corridor (US$ million) (Cost)
Infrastructure cost per kilometer, corridor (US$ million per km) (Cost)
User rating, corridor (Quality of service)
Corridor annual fatalities (Road Safety)

CORRIDOR Indicators - Line 5

Indicator Value Date Source
Corridor Name (Corridor info) Line 5 en.tehran.ir
Corridor classification (Corridor info) BRT 2017 ITDP
BRT Standard (Corridor info) BRT 2017 ITDP will do preliminary assessment shortly
Year corridor commenced (Corridor info) 2013 trafficorg.tehran.ir
Corridor service (Corridor info) Trunk lines 2014 trafficorg.tehran.ir
Peak load, corridor (passengers per hour per direction) (Corridor info)
Daily demand, corridor (passengers per day) (Corridor info)
Trunk lines, corridor (Corridor info)
Corridor length (km) (Running ways) 9.5 2023 livingintehran.com
Length of segregated lanes, corridor (km) (Running ways) 22 2012 www.ijsei.com
Length of segregated counterflow lanes, corridor (km) (Running ways) 0 2014 trafficorg.tehran.ir
Length of exclusive lanes, corridor (km) (Running ways) 0 2014 trafficorg.tehran.ir
Mixed traffic with-flow length, corridor (km) (Running ways) 0 2014 trafficorg.tehran.ir
Position of with-flow lanes, corridor (Running ways) Median 2014 trafficorg.tehran.ir
Position of counterflow lanes, corridor (Running ways) N/A 2014 trafficorg.tehran.ir
Position of bus doors, corridor (Running ways) Left 2014 trafficorg.tehran.ir
Lane material on running ways, corridor (Running ways) Asphalt 2014 trafficorg.tehran.ir
Lane material at stations, corridor (Running ways) Asphalt 2014 trafficorg.tehran.ir
Grade-separated intersections, corridor (Traffic engineering)
Fixed signal priority (Traffic engineering) None 2014 trafficorg.tehran.ir
Dynamic signal priority (Traffic engineering) All 2014 trafficorg.tehran.ir
Stations, corridor (Stations) 10 2023 livingintehran.com
Station spacing, corridor (m) (Stations) 950 2023 Calculated using corridor length and stations
Enhanced stations (Stations) Yes 2014 trafficorg.tehran.ir
Pre-board fare collection, corridor (Stations) All 2014 trafficorg.tehran.ir
Overtaking lanes, corridor (Stations) None 2014 trafficorg.tehran.ir
Station boarding level, corridor (Stations) Low-level platform 2014 trafficorg.tehran.ir
Type of bus guidance (ITS) None 2014 trafficorg.tehran.ir
Peak frequency, corridor (buses per hour per direction) (Travel time)
Operating speed, corridor (Travel time)
Express services (Travel time)
Speed limit (km/h) (Travel time)
Real time information, corridor (Comfort) All 2014 trafficorg.tehran.ir
Physically integrated feeders (Comfort) N/A 2014 trafficorg.tehran.ir
Total cost per kilometer, corridor (US$ million per km) (Cost)
Planning cost, corridor (US$ million) (Cost)
Infrastructure cost per kilometer, corridor (US$ million per km) (Cost)
User rating, corridor (Quality of service)
Corridor annual fatalities (Road Safety)

CORRIDOR Indicators - Line 7

Indicator Value Date Source
Corridor Name (Corridor info) Line 7 trafficorg.tehran.ir
Corridor classification (Corridor info) BRT 2017 ITDP
BRT Standard (Corridor info) BRT 2017 ITDP will do preliminary assessment shortly
Year corridor commenced (Corridor info) 2011 trafficorg.tehran.ir
Corridor service (Corridor info) Trunk lines 2014 trafficorg.tehran.ir
Peak load, corridor (passengers per hour per direction) (Corridor info)
Daily demand, corridor (passengers per day) (Corridor info)
Trunk lines, corridor (Corridor info)
Corridor length (km) (Running ways) 16 2023 livingintehran.com
Length of segregated lanes, corridor (km) (Running ways) 18.5 2014 trafficorg.tehran.ir
Length of segregated counterflow lanes, corridor (km) (Running ways) 0 2014 trafficorg.tehran.ir
Length of exclusive lanes, corridor (km) (Running ways) 0 2014 trafficorg.tehran.ir
Mixed traffic with-flow length, corridor (km) (Running ways) 0 2014 trafficorg.tehran.ir
Position of with-flow lanes, corridor (Running ways) Median 2014 trafficorg.tehran.ir
Position of counterflow lanes, corridor (Running ways) N/A 2014 trafficorg.tehran.ir
Position of bus doors, corridor (Running ways) Left 2014 trafficorg.tehran.ir
Lane material on running ways, corridor (Running ways) Asphalt 2014 trafficorg.tehran.ir
Lane material at stations, corridor (Running ways) Asphalt 2014 trafficorg.tehran.ir
Grade-separated intersections, corridor (Traffic engineering)
Fixed signal priority (Traffic engineering) None 2014 trafficorg.tehran.ir
Dynamic signal priority (Traffic engineering) All 2014 trafficorg.tehran.ir
Stations, corridor (Stations) 36 2023 livingintehran.com
Station spacing, corridor (m) (Stations) 444.4 2023 Calculated using corridor length and stations
Enhanced stations (Stations) Yes 2014 trafficorg.tehran.ir
Pre-board fare collection, corridor (Stations) All 2014 trafficorg.tehran.ir
Overtaking lanes, corridor (Stations) None 2014 trafficorg.tehran.ir
Station boarding level, corridor (Stations) Low-level platform 2014 trafficorg.tehran.ir
Type of bus guidance (ITS) None 2014 trafficorg.tehran.ir
Peak frequency, corridor (buses per hour per direction) (Travel time)
Operating speed, corridor (Travel time)
Express services (Travel time)
Speed limit (km/h) (Travel time)
Real time information, corridor (Comfort) All 2014 trafficorg.tehran.ir
Physically integrated feeders (Comfort) N/A 2014 trafficorg.tehran.ir
Total cost per kilometer, corridor (US$ million per km) (Cost)
Planning cost, corridor (US$ million) (Cost)
Infrastructure cost per kilometer, corridor (US$ million per km) (Cost)
User rating, corridor (Quality of service)
Corridor annual fatalities (Road Safety)

CORRIDOR Indicators - Line 8

Indicator Value Date Source
Corridor Name (Corridor info) Line 8 en.tehran.ir
Corridor classification (Corridor info) BRT 2017 ITDP
BRT Standard (Corridor info) BRT 2017 ITDP will do preliminary assessment shortly
Year corridor commenced (Corridor info) 2013 trafficorg.tehran.ir
Corridor service (Corridor info) Trunk lines 2014 trafficorg.tehran.ir
Peak load, corridor (passengers per hour per direction) (Corridor info)
Daily demand, corridor (passengers per day) (Corridor info) 40,000 2013 en.tehran.ir
Trunk lines, corridor (Corridor info)
Corridor length (km) (Running ways) 7 2023 livingintehran.com
Length of segregated lanes, corridor (km) (Running ways) 6.2 2012 www.ijsei.com
Length of segregated counterflow lanes, corridor (km) (Running ways) 0 2014 trafficorg.tehran.ir
Length of exclusive lanes, corridor (km) (Running ways) 0 2014 trafficorg.tehran.ir
Mixed traffic with-flow length, corridor (km) (Running ways) 0 2014 trafficorg.tehran.ir
Position of with-flow lanes, corridor (Running ways) Median 2014 trafficorg.tehran.ir
Position of counterflow lanes, corridor (Running ways) N/A 2014 trafficorg.tehran.ir
Position of bus doors, corridor (Running ways) Left 2014 trafficorg.tehran.ir
Lane material on running ways, corridor (Running ways) Asphalt 2014 trafficorg.tehran.ir
Lane material at stations, corridor (Running ways) Asphalt 2014 trafficorg.tehran.ir
Grade-separated intersections, corridor (Traffic engineering)
Fixed signal priority (Traffic engineering) None 2014 trafficorg.tehran.ir
Dynamic signal priority (Traffic engineering) All 2014 trafficorg.tehran.ir
Stations, corridor (Stations) 6 2023 livingintehran.com
Station spacing, corridor (m) (Stations) 1166.7 2023 Calculated using corridor length and stations
Enhanced stations (Stations) Yes 2014 trafficorg.tehran.ir
Pre-board fare collection, corridor (Stations) All 2014 trafficorg.tehran.ir
Overtaking lanes, corridor (Stations) None 2014 trafficorg.tehran.ir
Station boarding level, corridor (Stations) Low-level platform 2014 trafficorg.tehran.ir
Type of bus guidance (ITS) None 2014 trafficorg.tehran.ir
Peak frequency, corridor (buses per hour per direction) (Travel time)
Operating speed, corridor (Travel time)
Express services (Travel time)
Speed limit (km/h) (Travel time)
Real time information, corridor (Comfort) All 2014 trafficorg.tehran.ir
Physically integrated feeders (Comfort) N/A 2014 trafficorg.tehran.ir
Total cost per kilometer, corridor (US$ million per km) (Cost)
Planning cost, corridor (US$ million) (Cost)
Infrastructure cost per kilometer, corridor (US$ million per km) (Cost)
User rating, corridor (Quality of service)
Corridor annual fatalities (Road Safety)

CORRIDOR Indicators - Line 10

Indicator Value Date Source
Corridor Name (Corridor info) Line 10 trafficorg.tehran.ir
Corridor classification (Corridor info) BRT 2017 ITDP
BRT Standard (Corridor info) BRT 2017 ITDP will do preliminary assessment shortly
Year corridor commenced (Corridor info) 2011 trafficorg.tehran.ir
Corridor service (Corridor info) Trunk lines 2014 trafficorg.tehran.ir
Peak load, corridor (passengers per hour per direction) (Corridor info)
Daily demand, corridor (passengers per day) (Corridor info)
Trunk lines, corridor (Corridor info)
Corridor length (km) (Running ways) 23.5 2023 livingintehran.com
Length of segregated lanes, corridor (km) (Running ways) 10 2014 trafficorg.tehran.ir
Length of segregated counterflow lanes, corridor (km) (Running ways) 0 2014 trafficorg.tehran.ir
Length of exclusive lanes, corridor (km) (Running ways) 0 2014 trafficorg.tehran.ir
Mixed traffic with-flow length, corridor (km) (Running ways) 0 2014 trafficorg.tehran.ir
Position of with-flow lanes, corridor (Running ways) Median 2014 trafficorg.tehran.ir
Position of counterflow lanes, corridor (Running ways) N/A 2014 trafficorg.tehran.ir
Position of bus doors, corridor (Running ways) Left 2014 trafficorg.tehran.ir
Lane material on running ways, corridor (Running ways) Asphalt 2014 trafficorg.tehran.ir
Lane material at stations, corridor (Running ways) Asphalt 2014 trafficorg.tehran.ir
Grade-separated intersections, corridor (Traffic engineering)
Fixed signal priority (Traffic engineering) None 2014 trafficorg.tehran.ir
Dynamic signal priority (Traffic engineering) All 2014 trafficorg.tehran.ir
Stations, corridor (Stations) 25 2023 livingintehran.com
Station spacing, corridor (m) (Stations) 940 2023 Calculated using corridor length and stations
Enhanced stations (Stations) Yes 2014 trafficorg.tehran.ir
Pre-board fare collection, corridor (Stations) All 2014 trafficorg.tehran.ir
Overtaking lanes, corridor (Stations) None 2014 trafficorg.tehran.ir
Station boarding level, corridor (Stations) Low-level platform 2014 trafficorg.tehran.ir
Type of bus guidance (ITS) None 2014 trafficorg.tehran.ir
Peak frequency, corridor (buses per hour per direction) (Travel time)
Operating speed, corridor (Travel time)
Express services (Travel time)
Speed limit (km/h) (Travel time)
Real time information, corridor (Comfort) All 2014 trafficorg.tehran.ir
Physically integrated feeders (Comfort) N/A 2014 trafficorg.tehran.ir
Total cost per kilometer, corridor (US$ million per km) (Cost)
Planning cost, corridor (US$ million) (Cost)
Infrastructure cost per kilometer, corridor (US$ million per km) (Cost)
User rating, corridor (Quality of service)
Corridor annual fatalities (Road Safety)

CORRIDOR Indicators - Line 6

Indicator Value Date Source
Corridor Name (Corridor info) Line 6
Corridor classification (Corridor info)
BRT Standard (Corridor info)
Year corridor commenced (Corridor info)
Corridor service (Corridor info)
Peak load, corridor (passengers per hour per direction) (Corridor info)
Daily demand, corridor (passengers per day) (Corridor info)
Trunk lines, corridor (Corridor info)
Corridor length (km) (Running ways) 14.5 2023 livingintehran.com
Length of segregated lanes, corridor (km) (Running ways)
Length of segregated counterflow lanes, corridor (km) (Running ways)
Length of exclusive lanes, corridor (km) (Running ways)
Mixed traffic with-flow length, corridor (km) (Running ways)
Position of with-flow lanes, corridor (Running ways)
Position of counterflow lanes, corridor (Running ways)
Position of bus doors, corridor (Running ways)
Lane material on running ways, corridor (Running ways)
Lane material at stations, corridor (Running ways)
Grade-separated intersections, corridor (Traffic engineering)
Fixed signal priority (Traffic engineering)
Dynamic signal priority (Traffic engineering)
Stations, corridor (Stations) 17 2023 livingintehran.com
Station spacing, corridor (m) (Stations) 852.9 2023 Calculated using corridor length and stations
Enhanced stations (Stations)
Pre-board fare collection, corridor (Stations)
Overtaking lanes, corridor (Stations)
Station boarding level, corridor (Stations)
Type of bus guidance (ITS)
Peak frequency, corridor (buses per hour per direction) (Travel time)
Operating speed, corridor (Travel time)
Express services (Travel time)
Speed limit (km/h) (Travel time)
Real time information, corridor (Comfort)
Physically integrated feeders (Comfort)
Total cost per kilometer, corridor (US$ million per km) (Cost)
Planning cost, corridor (US$ million) (Cost)
Infrastructure cost per kilometer, corridor (US$ million per km) (Cost)
User rating, corridor (Quality of service)
Corridor annual fatalities (Road Safety)

CORRIDOR Indicators - Line 9

Indicator Value Date Source
Corridor Name (Corridor info) Line 9
Corridor classification (Corridor info)
BRT Standard (Corridor info)
Year corridor commenced (Corridor info)
Corridor service (Corridor info)
Peak load, corridor (passengers per hour per direction) (Corridor info)
Daily demand, corridor (passengers per day) (Corridor info)
Trunk lines, corridor (Corridor info)
Corridor length (km) (Running ways) 34 2023 livingintehran.com
Length of segregated lanes, corridor (km) (Running ways)
Length of segregated counterflow lanes, corridor (km) (Running ways)
Length of exclusive lanes, corridor (km) (Running ways)
Mixed traffic with-flow length, corridor (km) (Running ways)
Position of with-flow lanes, corridor (Running ways)
Position of counterflow lanes, corridor (Running ways)
Position of bus doors, corridor (Running ways)
Lane material on running ways, corridor (Running ways)
Lane material at stations, corridor (Running ways)
Grade-separated intersections, corridor (Traffic engineering)
Fixed signal priority (Traffic engineering)
Dynamic signal priority (Traffic engineering)
Stations, corridor (Stations) 34 2023 livingintehran.com
Station spacing, corridor (m) (Stations) 1,000 2023 Calculated using corridor length and stations
Enhanced stations (Stations)
Pre-board fare collection, corridor (Stations)
Overtaking lanes, corridor (Stations)
Station boarding level, corridor (Stations)
Type of bus guidance (ITS)
Peak frequency, corridor (buses per hour per direction) (Travel time)
Operating speed, corridor (Travel time)
Express services (Travel time)
Speed limit (km/h) (Travel time)
Real time information, corridor (Comfort)
Physically integrated feeders (Comfort)
Total cost per kilometer, corridor (US$ million per km) (Cost)
Planning cost, corridor (US$ million) (Cost)
Infrastructure cost per kilometer, corridor (US$ million per km) (Cost)
User rating, corridor (Quality of service)
Corridor annual fatalities (Road Safety)

Please, answer the questions below to start your download.

1

2

3

Thank you for answer.

Please, read the information below to start your download.

Thank you for filling out the questions.

If you prefer, you can download a full version of BRT DATA with worldwide data.
Download it here in Excel or CSV.

After you click the download button, your download will start automatically when the conversion process (it can take up to 30 seconds) is complete.