Global BRT Data

    ABOUT
  BRT
DATA

About Global BRTData

The BRTData gathers information on Bus Rapid Transit – BRT and bus priority systems in cities around the world. The platform is source of research for academics, journalists, students and municipal technicians, as well as provides technical background for decision making regarding public transport.

The data presented contemplate full BRT systems (dedicated bus lanes, unique brand, platform-level boarding, pre-board fare collection, and real time user information) and priority bus systems: cities with dedicated bus lanes, bus without some of the elements of a BRT. The website allows the user to know the systems and corridors of each city, compare indicators and generate graphs.

The BRTData was developed by Across Latitudes and Cultures – Bus Rapid Transit (ALC-BRT), a center of excellence (CoE) in BRT, and by WRI, with collaboration of the Latin American Association of Integrated Transport Systems and BRT (SIBRT) and the International Energy Agency (IEA). The platform is monthly updated with reliable data and verified by WRI Brasil Sustainable Cities.

    FIND
  YOUR
SYSTEM

BY CITY

    FIND
  YOUR
INDICATOR

SYSTEM LEVEL

Report

Crawley, United Kingdom - fastway

 

Crawley has 107,053 inhabitants.
The city has started the system in 2003 and now counts with 1 bus priority corridors consisting of 24 kilometers and benefiting 6,000 passengers every day. The average operational speed of the system is 20,0 km/h.

 

SYSTEM LENGTH IN RELATION TO United Kingdom

 

DAILY DEMAND IN RELATION TO United Kingdom

Some technical details about corridors are presented in the table below.

 

 

Corridor NameDaily demand, corridor (passengers per day)Corridor length (km)Stations, corridorPre-board fare collection, corridorOvertaking lanes, corridorStation boarding level, corridorOperating speed, corridor
6,000 24,00 48 20,0

Curiosities

SYSTEM Indicators

Indicator Value Date Source
GDP per capita (US$) (General info) 43,734 2015 databank.worldbank.org
Population, city (General info) 107,053 2012 www.ons.gov.uk
Population, metro area (General info) 107,053 2012 www.ons.gov.uk
Population density, metropolitan area (General info) 2,380 2012 www.ons.gov.uk
Modal split % public transport (General info)
Modal split % private transport (General info)
Modal split % non motorized (General info)
System name (System info) Fastway
Corridors (System info) 1 2005 Bus Rapid Transit Planning Guide (ITDP) 2007
Year system commenced (System info) 2003 Bus Rapid Transit Planning Guide (ITDP) 2007
Transit agency (System info)
Standard fare (US$) (System info) 3,02 2015 www.metrobus.co.uk
Annual fare revenue (US$ millions) (System info) 3,81 Calculated using annual demand and fare
Fare integration within the system (System info)
Citywide fare integration (other modes) (System info)
Integration terminals (System info) 3 2007 Bus Rapid Transit Planning Guide (ITDP) 2007
Transfer stations (System info)
Peak load (passengers per hour per direction) (System info)
Daily demand (passengers per day) (System info) 6,000 2005 Bus Rapid Transit Planning Guide (ITDP) 2007
Annual demand (passengers per year) (System info) 1,800,000 2005 Calculated using daily demand and 300 working days
Capital productivity (boardings per bus per day) (System info) 261 2007 Bus Rapid Transit Planning Guide (ITDP) 2007
Operational productivity (IPK) (System info)
Operations control center (System info)
Trunk lines (System info) 2
Feeder routes (System info)
Depots (System info) 1 2007 Bus Rapid Transit Planning Guide (ITDP) 2007
System length (km) (Additional Information) 24,00 2005 Bus Rapid Transit Planning Guide (ITDP) 2007
Position of with-flow lanes (Additional Information) Curbside 2007 Bus Rapid Transit Planning Guide (ITDP) 2007
Position of counterflow lanes (Additional Information)
Position of bus doors (Additional Information) Right 2007 Bus Rapid Transit Planning Guide (ITDP) 2007
Lane material on running ways (Additional Information) Asphalt & Concrete 2007 Bus Rapid Transit Planning Guide (ITDP) 2007
Lane material at stations (Additional Information) Asphalt & Concrete 2007 Bus Rapid Transit Planning Guide (ITDP) 2007
Stations (Additional Information) 48 2005 Bus Rapid Transit Planning Guide (ITDP) 2007
Station spacing (m) (Additional Information) 400,0 2007 Bus Rapid Transit Planning Guide (ITDP) 2007
Pre-board fare collection (Additional Information)
Overtaking lanes (Additional Information)
Station boarding level (Additional Information)
Real time information (Additional Information)
Peak frequency (buses per hour) (Additional Information) 6 2007 Bus Rapid Transit Planning Guide (ITDP) 2007
Operating speed (Additional Information) 20,0 2007 Bus Rapid Transit Planning Guide (ITDP) 2007
Total fleet (System fleet) 23 2005 Bus Rapid Transit Planning Guide (ITDP) 2007
Fleet, standard buses (System fleet)
Average age, standard buses (System fleet)
Propulsion, standard buses (System fleet)
Fuel type, standard buses (System fleet)
Fuel economy, standard buses (System fleet)
Fleet, articulated buses (System fleet)
Average age, articulated buses (System fleet)
Propulsion, articulated buses (System fleet)
Fuel type, articulated buses (System fleet)
Fuel economy, articulated buses (System fleet)
Fleet, bi-articulated buses (System fleet)
Average age, bi-articulated buses (System fleet)
Propulsion, bi-articulated buses (System fleet)
Fuel type, bi-articulated buses (System fleet)
Fuel economy, bi-articulated buses (System fleet)
Fleet, double-decker buses (System fleet)
Average age, double-decker buses (System fleet)
Propulsion, double-decker buses (System fleet)
Fuel type, double-decker buses (System fleet)
Fuel economy, double-decker buses (System fleet)
Typical fuel type (System fleet) Diesel 2007 Bus Rapid Transit Planning Guide (ITDP) 2007
City's diesel sulfur content (ppm) (System fleet)
Total cost per kilometer (US$ million per km) (System cost) 2,000 2007 Bus Rapid Transit Planning Guide (ITDP) 2007
Planning cost (US$ million) (System cost)
Capital cost per kilometer (US$ million per km) (System cost)
Infrastructure cost per kilometer (US$ million per km) (System cost) 2,000 2007 Bus Rapid Transit Planning Guide (ITDP) 2007
Equipment cost (US$ million) (System cost) 0,580 2007, only trunk vehicles Bus Rapid Transit Planning Guide (ITDP) 2007
Annual operational cost (US$ million) (System cost)
User rating (System image)
Brand and logo (System image)
Unique bus livery (System image)
Citywide annual road fatalities (System road safety)
Citywide annual injuries (System road safety)

CORRIDOR Indicators -

Indicator Value Date Source
Corridor Name (Corridor info)
Year corridor commenced (Corridor info) 2003 Bus Rapid Transit Planning Guide (ITDP) 2007
Corridor service (Corridor info)
Peak load, corridor (passengers per hour per direction) (Corridor info)
Daily demand, corridor (passengers per day) (Corridor info) 6,000 2005 Bus Rapid Transit Planning Guide (ITDP) 2007
Trunk lines, corridor (Corridor info) 2 2007 Bus Rapid Transit Planning Guide (ITDP) 2007
Corridor length (km) (Running ways) 24,00 2005 Bus Rapid Transit Planning Guide (ITDP) 2007
Length of segregated lanes, corridor (km) (Running ways)
Length of segregated counterflow lanes, corridor (km) (Running ways)
Length of exclusive lanes, corridor (km) (Running ways)
Mixed traffic with-flow length, corridor (km) (Running ways)
Position of with-flow lanes, corridor (Running ways)
Position of counterflow lanes, corridor (Running ways)
Position of bus doors, corridor (Running ways) Right 2007 Bus Rapid Transit Planning Guide (ITDP) 2007
Lane material on running ways, corridor (Running ways) Asphalt & Concrete 2007 Bus Rapid Transit Planning Guide (ITDP) 2007
Lane material at stations, corridor (Running ways) Asphalt & Concrete 2007 Bus Rapid Transit Planning Guide (ITDP) 2007
Grade-separated intersections, corridor (Traffic engineering)
Fixed signal priority (Traffic engineering)
Dynamic signal priority (Traffic engineering)
Stations, corridor (Stations) 48 2005 Bus Rapid Transit Planning Guide (ITDP) 2007
Station spacing, corridor (m) (Stations)
Enhanced stations (Stations)
Pre-board fare collection, corridor (Stations)
Overtaking lanes, corridor (Stations)
Station boarding level, corridor (Stations)
Type of bus guidance (ITS)
Peak frequency, corridor (buses per hour per direction) (Travel time) 6 2007 Bus Rapid Transit Planning Guide (ITDP) 2007
Operating speed, corridor (Travel time) 20,0 2007 Bus Rapid Transit Planning Guide (ITDP) 2007
Express services (Travel time)
Speed limit (km/h) (Travel time)
Real time information, corridor (Comfort)
Physically integrated feeders (Comfort)
Total cost per kilometer, corridor (US$ million per km) (Cost) 2,000 2007 Bus Rapid Transit Planning Guide (ITDP) 2007
Planning cost, corridor (US$ million) (Cost)
Infrastructure cost per kilometer, corridor (US$ million per km) (Cost) 2,000 2007 Bus Rapid Transit Planning Guide (ITDP) 2007
User rating, corridor (Quality of service)
Corridor annual fatalities (Road Safety)

Please, answer the questions below to start your download.

1

2

3

Thank you for answer.

Please, read the information below to start your download.

Thank you for filling out the questions.

If you prefer, you can download a full version of BRT DATA with worldwide data.
Download it here in Excel or CSV.

After you click the download button, your download will start automatically when the conversion process (it can take up to 30 seconds) is complete.