Global BRTData

    ABOUT
  BRT
DATA

About Global BRTData

The BRTData is a Project of Across Latitudes and Cultures – Bus Rapid Transit (ALC-BRT), a Centre of Excellence for Bus Rapid Transit. The platform construction and data collect are the result of a partnership between the ALC-BRT members, the International Energy Agency (IEA) and the Latin American Association of Integrated Transport Systems and BRT (SIBRT). Currently, the BRTData is managed and updated by WRI Brasil Sustainable Cities.

    FIND
  YOUR
SYSTEM

BY CITY

    FIND
  YOUR
INDICATOR

SYSTEM

Report

Buenos Aires, Argentina - metrobus

 

Buenos Aires has 2,891,082 inhabitants. 44,7% of total trips are made by public transport, as showed in the graph below.

 

MODAL SPLIT - BUENOS AIRES

The city has started the system in 2011 and now counts with 7 bus priority corridors consisting of 56 kilometers and benefiting 989,000 passengers every day. The average operational speed of the system is 24,0 km/h.

 

SYSTEM LENGTH IN RELATION TO Argentina

 

DAILY DEMAND IN RELATION TO Argentina

Some technical details about corridors are presented in the table below.

 

 

Corridor NameDaily demand, corridor (passengers per day)Corridor length (km)Stations, corridorPre-board fare collection, corridorOvertaking lanes, corridorStation boarding level, corridorOperating speed, corridor
Sur - Ramal Coronel Roca 250,000 9,30 18 Partial None Low-level platform
Sur - Ramal Fernandéz de la Cruz 250,000 13,70 18 Partial None Low-level platform
9 de Julio 255,000 3,00 17 Partial Partial Low-level platform
Juan B. Justo 94,000 12,00 21 Partial None Low-level platform 24,0
AU 25 de Mayo 120,000 7,50 0 None N/A
San Martín 70,000 5,80 11 Low-level platform
Norte 200,000 5,00 10 All Low-level platform

Curiosities

SYSTEM Indicators

Indicator Value Date Source
GDP per capita (US$) (General info) 12,751 2014 databank.worldbank.org
Population, city (General info) 2,891,082 2010 www.censo2010.indec.gov.ar
Population, metro area (General info) 15,594,428 2010 www.censo2010.indec.gov.ar
Population density, metropolitan area (General info) 50,7 2010 en.wikipedia.org
Modal split % public transport (General info) 44,7 2010 omu.caf.com
Modal split % private transport (General info) 46.3 2010 omu.caf.com
Modal split % non motorized (General info) 9,0 2010 omu.caf.com
System name (System info) Metrobus
Corridors (System info) 7 2016 www.buenosaires.gob.ar
Year system commenced (System info) 2011
Transit agency (System info) Metrobus 2016 movilidad.buenosaires.gob.ar
Standard fare (US$) (System info) 0,47 2016 www.xcolectivo.com.ar
Annual fare revenue (US$ millions) (System info) 97,27 Calculated using annual demand and fare
Fare integration within the system (System info) Yes 2013 www.sube.gob.ar
Citywide fare integration (other modes) (System info) Yes 2013 www.sube.gob.ar
Integration terminals (System info) 2 2016 www.buenosaires.gob.ar
Transfer stations (System info) 0 2016 www.buenosaires.gob.ar
Peak load (passengers per hour per direction) (System info) 3,500 2016 www.buenosaires.gob.ar
Daily demand (passengers per day) (System info) 989,000 2016 www.buenosaires.gob.ar
Annual demand (passengers per year) (System info) 296,700,000 2016 Calculated using daily demand and 300 working days
Capital productivity (boardings per bus per day) (System info)
Operational productivity (IPK) (System info)
Operations control center (System info) All 2013 movilidad.buenosaires.gob.ar
Trunk lines (System info) 71 2016 www.buenosaires.gob.ar
Feeder routes (System info) 0 2016
Depots (System info)
System length (km) (Additional Information) 56,30 2016 www.buenosaires.gob.ar
Position of with-flow lanes (Additional Information) Median & Curbside 2015 www.google.com.br && www.google.com.br
Position of counterflow lanes (Additional Information) Median 2016 www.buenosaires.gob.ar
Position of bus doors (Additional Information) Right 2016 www.buenosaires.gob.ar
Lane material on running ways (Additional Information) Asphalt & Concrete 2016 Google Maps
Lane material at stations (Additional Information) Concrete 2016 Google Maps
Stations (Additional Information) 91 www.buenosaires.gob.ar
Station spacing (m) (Additional Information) 663,8 Calculated using system length and stations
Pre-board fare collection (Additional Information) Partial 2013 movilidad.buenosaires.gob.ar
Overtaking lanes (Additional Information) Partial 2016
Station boarding level (Additional Information) Low-level platform 2016 www.buenosaires.gob.ar
Real time information (Additional Information) Partial 2016
Peak frequency (buses per hour) (Additional Information) 30 2016 www.buenosaires.gob.ar
Operating speed (Additional Information) 24,0
Total fleet (System fleet)
Fleet, standard buses (System fleet)
Average age, standard buses (System fleet)
Propulsion, standard buses (System fleet)
Fuel type, standard buses (System fleet)
Fuel economy, standard buses (System fleet)
Fleet, articulated buses (System fleet)
Average age, articulated buses (System fleet)
Propulsion, articulated buses (System fleet)
Fuel type, articulated buses (System fleet)
Fuel economy, articulated buses (System fleet)
Fleet, bi-articulated buses (System fleet) 0 2013
Average age, bi-articulated buses (System fleet) N/A 2013
Propulsion, bi-articulated buses (System fleet) N/A 2013
Fuel type, bi-articulated buses (System fleet) N/A 2013
Fuel economy, bi-articulated buses (System fleet) N/A 2013
Fleet, double-decker buses (System fleet) 0 2013
Average age, double-decker buses (System fleet) N/A 2013
Propulsion, double-decker buses (System fleet) N/A 2013
Fuel type, double-decker buses (System fleet) N/A 2013
Fuel economy, double-decker buses (System fleet) N/A 2013
Typical fuel type (System fleet) Diesel 2013
City's diesel sulfur content (ppm) (System fleet)
Total cost per kilometer (US$ million per km) (System cost)
Planning cost (US$ million) (System cost)
Capital cost per kilometer (US$ million per km) (System cost)
Infrastructure cost per kilometer (US$ million per km) (System cost) 6,001 Calculated using corridors data
Equipment cost (US$ million) (System cost)
Annual operational cost (US$ million) (System cost)
User rating (System image)
Brand and logo (System image) Yes 2016 www.buenosaires.gob.ar
Unique bus livery (System image) No 2016 www.buenosaires.gob.ar
Citywide annual road fatalities (System road safety)
Citywide annual injuries (System road safety)

CORRIDOR Indicators - Sur - Ramal Coronel Roca

Indicator Value Date Source
Corridor Name (Corridor info) Sur - Ramal Coronel Roca movilidad.buenosaires.gob.ar
Year corridor commenced (Corridor info) 2013 movilidad.buenosaires.gob.ar
Corridor service (Corridor info) Conventional bus services 2016 www.buenosaires.gob.ar
Peak load, corridor (passengers per hour per direction) (Corridor info)
Daily demand, corridor (passengers per day) (Corridor info) 250,000 2016, for both sections of Corridor Sur www.buenosaires.gob.ar
Trunk lines, corridor (Corridor info) 21 2016, for both sections of Corridor Sur www.buenosaires.gob.ar
Corridor length (km) (Running ways) 9,30 2013 movilidad.buenosaires.gob.ar
Length of segregated lanes, corridor (km) (Running ways) 9,30 2013 movilidad.buenosaires.gob.ar
Length of segregated counterflow lanes, corridor (km) (Running ways) 0,00 2013 www.clarin.com
Length of exclusive lanes, corridor (km) (Running ways) 0,00 2013 www.clarin.com
Mixed traffic with-flow length, corridor (km) (Running ways) 0,00 2013 www.clarin.com
Position of with-flow lanes, corridor (Running ways) Curbside & Median 2015 www.google.com.br && www.google.com.br
Position of counterflow lanes, corridor (Running ways) N/A 2013 www.clarin.com
Position of bus doors, corridor (Running ways) Right 2013 www.clarin.com
Lane material on running ways, corridor (Running ways) Asphalt 2013 www.larazon.com.ar
Lane material at stations, corridor (Running ways) Concrete 2013 www.larazon.com.ar
Grade-separated intersections, corridor (Traffic engineering) None 2013 www.clarin.com
Fixed signal priority (Traffic engineering) None 2013 movilidad.buenosaires.gob.ar
Dynamic signal priority (Traffic engineering) None 2013 movilidad.buenosaires.gob.ar
Stations, corridor (Stations) 18 2016, 4 stations operates in only one direction www.buenosaires.gob.ar
Station spacing, corridor (m) (Stations) 516,7 2013 Calculated using corridor length and stations
Enhanced stations (Stations) Yes 2016 www.buenosaires.gob.ar
Pre-board fare collection, corridor (Stations) Partial 2013 movilidad.buenosaires.gob.ar
Overtaking lanes, corridor (Stations) None 2013 www.larazon.com.ar
Station boarding level, corridor (Stations) Low-level platform 2013 www.clarin.com
Type of bus guidance (ITS) Physical 2013 movilidad.buenosaires.gob.ar
Peak frequency, corridor (buses per hour per direction) (Travel time)
Operating speed, corridor (Travel time)
Express services (Travel time) No 2013 movilidad.buenosaires.gob.ar
Speed limit (km/h) (Travel time)
Real time information, corridor (Comfort) None 2013
Physically integrated feeders (Comfort) No 2013
Total cost per kilometer, corridor (US$ million per km) (Cost)
Planning cost, corridor (US$ million) (Cost)
Infrastructure cost per kilometer, corridor (US$ million per km) (Cost) 1,939 2013, for both sections of Corridor Sur www.lanacion.com.ar
User rating, corridor (Quality of service)
Corridor annual fatalities (Road Safety)

CORRIDOR Indicators - Sur - Ramal Fernandéz de la Cruz

Indicator Value Date Source
Corridor Name (Corridor info) Sur - Ramal Fernandéz de la Cruz movilidad.buenosaires.gob.ar includes sections Av. Brasil and Av.J. de Garay (route line 43)
Year corridor commenced (Corridor info) 2013 movilidad.buenosaires.gob.ar
Corridor service (Corridor info) Conventional bus services 2016 www.buenosaires.gob.ar
Peak load, corridor (passengers per hour per direction) (Corridor info)
Daily demand, corridor (passengers per day) (Corridor info) 250,000 2016, for both sections of Corridor Sur www.buenosaires.gob.ar
Trunk lines, corridor (Corridor info) 21 2016, for both sections of Corridor Sur www.buenosaires.gob.ar
Corridor length (km) (Running ways) 13,70 2013 movilidad.buenosaires.gob.ar
Length of segregated lanes, corridor (km) (Running ways) 13,70 2013 movilidad.buenosaires.gob.ar
Length of segregated counterflow lanes, corridor (km) (Running ways) 0,00 2013 www.clarin.com
Length of exclusive lanes, corridor (km) (Running ways) 0,00 2013 www.clarin.com
Mixed traffic with-flow length, corridor (km) (Running ways) 0,00 2013 www.clarin.com
Position of with-flow lanes, corridor (Running ways) Median 2013 Google Maps
Position of counterflow lanes, corridor (Running ways) N/A 2013 www.clarin.com
Position of bus doors, corridor (Running ways) Right 2013 www.clarin.com
Lane material on running ways, corridor (Running ways) Asphalt 2013 www.larazon.com.ar
Lane material at stations, corridor (Running ways) Concrete 2013 www.larazon.com.ar
Grade-separated intersections, corridor (Traffic engineering) None 2013 www.clarin.com
Fixed signal priority (Traffic engineering) None 2013 movilidad.buenosaires.gob.ar
Dynamic signal priority (Traffic engineering) None 2013 movilidad.buenosaires.gob.ar
Stations, corridor (Stations) 18 2016, 3 stations operates in only one direction www.buenosaires.gob.ar
Station spacing, corridor (m) (Stations) 761,1 2013 Calculated using corridor length and stations
Enhanced stations (Stations) Yes 2016 www.buenosaires.gob.ar
Pre-board fare collection, corridor (Stations) Partial 2013 movilidad.buenosaires.gob.ar
Overtaking lanes, corridor (Stations) None 2013 www.larazon.com.ar
Station boarding level, corridor (Stations) Low-level platform 2013 www.clarin.com
Type of bus guidance (ITS) Physical 2013 movilidad.buenosaires.gob.ar
Peak frequency, corridor (buses per hour per direction) (Travel time)
Operating speed, corridor (Travel time)
Express services (Travel time) No 2013 movilidad.buenosaires.gob.ar
Speed limit (km/h) (Travel time)
Real time information, corridor (Comfort) None 2013
Physically integrated feeders (Comfort) No 2013
Total cost per kilometer, corridor (US$ million per km) (Cost)
Planning cost, corridor (US$ million) (Cost)
Infrastructure cost per kilometer, corridor (US$ million per km) (Cost) 1,939 2013, for both sections of Corridor Sur www.lanacion.com.ar
User rating, corridor (Quality of service)
Corridor annual fatalities (Road Safety)

CORRIDOR Indicators - 9 de Julio

Indicator Value Date Source
Corridor Name (Corridor info) 9 de Julio movilidad.buenosaires.gob.ar
Year corridor commenced (Corridor info) 2013 m24digital.com
Corridor service (Corridor info) Conventional bus services 2016 www.buenosaires.gob.ar
Peak load, corridor (passengers per hour per direction) (Corridor info)
Daily demand, corridor (passengers per day) (Corridor info) 255,000 2016 www.buenosaires.gob.ar
Trunk lines, corridor (Corridor info) 11 2016 www.buenosaires.gob.ar
Corridor length (km) (Running ways) 3,00 2013 movilidad.buenosaires.gob.ar
Length of segregated lanes, corridor (km) (Running ways) 0,00 2013
Length of segregated counterflow lanes, corridor (km) (Running ways) 3,00 2013 movilidad.buenosaires.gob.ar
Length of exclusive lanes, corridor (km) (Running ways) 0,00 2013
Mixed traffic with-flow length, corridor (km) (Running ways) 0,00 2013
Position of with-flow lanes, corridor (Running ways) N/A 2013
Position of counterflow lanes, corridor (Running ways) Median 2013 movilidad.buenosaires.gob.ar
Position of bus doors, corridor (Running ways) Right 2013 movilidad.buenosaires.gob.ar
Lane material on running ways, corridor (Running ways) Concrete 2013 www.hormigonelaborado.com
Lane material at stations, corridor (Running ways) Concrete 2013 www.hormigonelaborado.com
Grade-separated intersections, corridor (Traffic engineering) None 2013 movilidad.buenosaires.gob.ar
Fixed signal priority (Traffic engineering) None 2013 movilidad.buenosaires.gob.ar
Dynamic signal priority (Traffic engineering) None 2013 movilidad.buenosaires.gob.ar
Stations, corridor (Stations) 17 2016 www.buenosaires.gob.ar
Station spacing, corridor (m) (Stations) 600,0 2013 Calculated using corridor length and stations
Enhanced stations (Stations) Yes 2016 www.buenosaires.gob.ar
Pre-board fare collection, corridor (Stations) Partial 2013 movilidad.buenosaires.gob.ar
Overtaking lanes, corridor (Stations) Partial 2013 movilidad.buenosaires.gob.ar
Station boarding level, corridor (Stations) Low-level platform 2013 www.youtube.com
Type of bus guidance (ITS) None 2013 www.youtube.com
Peak frequency, corridor (buses per hour per direction) (Travel time)
Operating speed, corridor (Travel time)
Express services (Travel time) No 2013 www.xcolectivo.com.ar
Speed limit (km/h) (Travel time)
Real time information, corridor (Comfort) All 2013 movilidad.buenosaires.gob.ar
Physically integrated feeders (Comfort) No 2013
Total cost per kilometer, corridor (US$ million per km) (Cost)
Planning cost, corridor (US$ million) (Cost)
Infrastructure cost per kilometer, corridor (US$ million per km) (Cost) 21,467 2013 www.lanacion.com.ar
User rating, corridor (Quality of service)
Corridor annual fatalities (Road Safety)

CORRIDOR Indicators - Juan B. Justo

Indicator Value Date Source
Corridor Name (Corridor info) Juan B. Justo www.buenosaires.gob.ar
Year corridor commenced (Corridor info) 2011 www.lanacion.com.ar
Corridor service (Corridor info) Conventional bus services 2016 www.buenosaires.gob.ar
Peak load, corridor (passengers per hour per direction) (Corridor info) 3,500 2016 www.buenosaires.gob.ar
Daily demand, corridor (passengers per day) (Corridor info) 94,000 2016 www.buenosaires.gob.ar
Trunk lines, corridor (Corridor info) 7 2016 www.buenosaires.gob.ar
Corridor length (km) (Running ways) 12,00 2016 www.buenosaires.gob.ar
Length of segregated lanes, corridor (km) (Running ways) 12,00 2016 www.buenosaires.gob.ar
Length of segregated counterflow lanes, corridor (km) (Running ways) 0,00 2016
Length of exclusive lanes, corridor (km) (Running ways) 0,00 2016
Mixed traffic with-flow length, corridor (km) (Running ways) 0,00 2016
Position of with-flow lanes, corridor (Running ways) Median 2011 movilidad.buenosaires.gob.ar
Position of counterflow lanes, corridor (Running ways) N/A 2011
Position of bus doors, corridor (Running ways) Right 2011 www.youtube.com
Lane material on running ways, corridor (Running ways) Asphalt 2011 www.youtube.com
Lane material at stations, corridor (Running ways) Concrete 2011 www.youtube.com
Grade-separated intersections, corridor (Traffic engineering) None 2011 www.lanacion.com.ar
Fixed signal priority (Traffic engineering) None 2011 www.lanacion.com.ar
Dynamic signal priority (Traffic engineering) None 2011
Stations, corridor (Stations) 21 2016 www.buenosaires.gob.ar
Station spacing, corridor (m) (Stations) 571,4 2016 Calculated using corridor length and stations
Enhanced stations (Stations) Yes 2012 www.youtube.com
Pre-board fare collection, corridor (Stations) Partial 2013 movilidad.buenosaires.gob.ar
Overtaking lanes, corridor (Stations) None 2013 www.lanacion.com.ar
Station boarding level, corridor (Stations) Low-level platform 2011 www.youtube.com
Type of bus guidance (ITS) None 2011
Peak frequency, corridor (buses per hour per direction) (Travel time) 30 2016 www.buenosaires.gob.ar
Operating speed, corridor (Travel time) 24,0 2011 m24digital.com
Express services (Travel time) No 2013 www.xcolectivo.com.ar
Speed limit (km/h) (Travel time) 60 2013
Real time information, corridor (Comfort) All 2011 movilidad.buenosaires.gob.ar
Physically integrated feeders (Comfort) No 2013
Total cost per kilometer, corridor (US$ million per km) (Cost)
Planning cost, corridor (US$ million) (Cost)
Infrastructure cost per kilometer, corridor (US$ million per km) (Cost) 2,033 2011 www.lanacion.com.ar
User rating, corridor (Quality of service) Good 2012 www.lanacion.com.ar
Corridor annual fatalities (Road Safety)

CORRIDOR Indicators - AU 25 de Mayo

Indicator Value Date Source
Corridor Name (Corridor info) AU 25 de Mayo www.buenosaires.gob.ar
Year corridor commenced (Corridor info) 2015 www.lanacion.com.ar
Corridor service (Corridor info) Conventional bus services 2016 www.buenosaires.gob.ar
Peak load, corridor (passengers per hour per direction) (Corridor info)
Daily demand, corridor (passengers per day) (Corridor info) 120,000 2016 www.buenosaires.gob.ar
Trunk lines, corridor (Corridor info) 8 2016 www.buenosaires.gob.ar
Corridor length (km) (Running ways) 7,50 2016 www.buenosaires.gob.ar
Length of segregated lanes, corridor (km) (Running ways) 0,00 2016 www.buenosaires.gob.ar
Length of segregated counterflow lanes, corridor (km) (Running ways) 0,00 2016 www.buenosaires.gob.ar
Length of exclusive lanes, corridor (km) (Running ways) 7,50 2016, reversible corridor. One direction www.buenosaires.gob.ar
Mixed traffic with-flow length, corridor (km) (Running ways) 0,00 2016 www.buenosaires.gob.ar
Position of with-flow lanes, corridor (Running ways) Median 2015 Google Maps
Position of counterflow lanes, corridor (Running ways) N/A 2015
Position of bus doors, corridor (Running ways) Right 2016 www.buenosaires.gob.ar
Lane material on running ways, corridor (Running ways) Asphalt 2015 www.google.com.br
Lane material at stations, corridor (Running ways) N/A
Grade-separated intersections, corridor (Traffic engineering) All 2015 Google Maps
Fixed signal priority (Traffic engineering) N/A
Dynamic signal priority (Traffic engineering) N/A
Stations, corridor (Stations) 0 2015 Google Maps
Station spacing, corridor (m) (Stations) N/A
Enhanced stations (Stations) N/A
Pre-board fare collection, corridor (Stations)
Overtaking lanes, corridor (Stations) None 2016 www.buenosaires.gob.ar
Station boarding level, corridor (Stations) N/A
Type of bus guidance (ITS)
Peak frequency, corridor (buses per hour per direction) (Travel time)
Operating speed, corridor (Travel time)
Express services (Travel time)
Speed limit (km/h) (Travel time) 80 2015 www.google.com.br
Real time information, corridor (Comfort) N/A
Physically integrated feeders (Comfort)
Total cost per kilometer, corridor (US$ million per km) (Cost)
Planning cost, corridor (US$ million) (Cost)
Infrastructure cost per kilometer, corridor (US$ million per km) (Cost) 3,627 2015 www.lanacion.com.ar
User rating, corridor (Quality of service)
Corridor annual fatalities (Road Safety)

CORRIDOR Indicators - San Martín

Indicator Value Date Source
Corridor Name (Corridor info) San Martín www.buenosaires.gob.ar
Year corridor commenced (Corridor info) 2016 www.clarin.com
Corridor service (Corridor info) Conventional bus services 2016 www.buenosaires.gob.ar
Peak load, corridor (passengers per hour per direction) (Corridor info)
Daily demand, corridor (passengers per day) (Corridor info) 70,000 2016 www.buenosaires.gob.ar
Trunk lines, corridor (Corridor info) 11 2016 www.buenosaires.gob.ar
Corridor length (km) (Running ways) 5,80 2016 www.buenosaires.gob.ar
Length of segregated lanes, corridor (km) (Running ways) 5,80 2016 www.buenosaires.gob.ar
Length of segregated counterflow lanes, corridor (km) (Running ways) 0,00 2016 www.buenosaires.gob.ar
Length of exclusive lanes, corridor (km) (Running ways) 0,00 2016 www.buenosaires.gob.ar
Mixed traffic with-flow length, corridor (km) (Running ways) 0,00 2016 www.buenosaires.gob.ar
Position of with-flow lanes, corridor (Running ways) Median 2016 www.buenosaires.gob.ar
Position of counterflow lanes, corridor (Running ways) N/A 2016
Position of bus doors, corridor (Running ways) Right 2016 www.buenosaires.gob.ar
Lane material on running ways, corridor (Running ways) Asphalt 2016 www.youtube.com
Lane material at stations, corridor (Running ways) Concrete 2016 www.youtube.com
Grade-separated intersections, corridor (Traffic engineering) Partial 2016 www.buenosaires.gob.ar
Fixed signal priority (Traffic engineering)
Dynamic signal priority (Traffic engineering)
Stations, corridor (Stations) 11 2016, there are 12 stations in one direction and 11 in the other direction www.buenosaires.gob.ar
Station spacing, corridor (m) (Stations) 527,3 2016 Calculated using corridor length and stations
Enhanced stations (Stations) Yes 2016 www.youtube.com
Pre-board fare collection, corridor (Stations)
Overtaking lanes, corridor (Stations)
Station boarding level, corridor (Stations) Low-level platform 2016 www.youtube.com
Type of bus guidance (ITS)
Peak frequency, corridor (buses per hour per direction) (Travel time)
Operating speed, corridor (Travel time)
Express services (Travel time) No 2016 www.buenosaires.gob.ar
Speed limit (km/h) (Travel time)
Real time information, corridor (Comfort)
Physically integrated feeders (Comfort)
Total cost per kilometer, corridor (US$ million per km) (Cost)
Planning cost, corridor (US$ million) (Cost)
Infrastructure cost per kilometer, corridor (US$ million per km) (Cost) 1,267 2015 www.nueva-ciudad.com.ar
User rating, corridor (Quality of service)
Corridor annual fatalities (Road Safety)

CORRIDOR Indicators - Norte

Indicator Value Date Source
Corridor Name (Corridor info) Norte www.buenosaires.gob.ar
Year corridor commenced (Corridor info) 2015 www.lanacion.com.ar
Corridor service (Corridor info) Conventional bus services 2016 www.buenosaires.gob.ar
Peak load, corridor (passengers per hour per direction) (Corridor info)
Daily demand, corridor (passengers per day) (Corridor info) 200,000 2016 www.buenosaires.gob.ar
Trunk lines, corridor (Corridor info) 20 2016 www.buenosaires.gob.ar
Corridor length (km) (Running ways) 5,00 2016 www.buenosaires.gob.ar
Length of segregated lanes, corridor (km) (Running ways) 5,00 2016 www.buenosaires.gob.ar
Length of segregated counterflow lanes, corridor (km) (Running ways) 0,00 2016 www.buenosaires.gob.ar
Length of exclusive lanes, corridor (km) (Running ways) 0,00 2016 www.buenosaires.gob.ar
Mixed traffic with-flow length, corridor (km) (Running ways) 0,00 2016 www.buenosaires.gob.ar
Position of with-flow lanes, corridor (Running ways) Median 2016 www.buenosaires.gob.ar
Position of counterflow lanes, corridor (Running ways) N/A 2016
Position of bus doors, corridor (Running ways) Right 2016 www.buenosaires.gob.ar
Lane material on running ways, corridor (Running ways) Concrete 2015 www.google.com.br
Lane material at stations, corridor (Running ways) Concrete 2015 www.google.com.br
Grade-separated intersections, corridor (Traffic engineering) Partial 2015 www.google.com.br
Fixed signal priority (Traffic engineering)
Dynamic signal priority (Traffic engineering)
Stations, corridor (Stations) 10 2016, there are 11 stations in one direction and 10 in the other direction www.buenosaires.gob.ar
Station spacing, corridor (m) (Stations) 500,0 2017 Calculated using corridor length and stations
Enhanced stations (Stations) Yes 2016 www.buenosaires.gob.ar
Pre-board fare collection, corridor (Stations)
Overtaking lanes, corridor (Stations) All 2015 www.google.com.br
Station boarding level, corridor (Stations) Low-level platform 2016 www.buenosaires.gob.ar
Type of bus guidance (ITS) Physical 2016 www.buenosaires.gob.ar
Peak frequency, corridor (buses per hour per direction) (Travel time)
Operating speed, corridor (Travel time)
Express services (Travel time)
Speed limit (km/h) (Travel time)
Real time information, corridor (Comfort) Partial 2016 www.buenosaires.gob.ar
Physically integrated feeders (Comfort)
Total cost per kilometer, corridor (US$ million per km) (Cost)
Planning cost, corridor (US$ million) (Cost)
Infrastructure cost per kilometer, corridor (US$ million per km) (Cost) 5,672 2015 www.lanacion.com.ar
User rating, corridor (Quality of service)
Corridor annual fatalities (Road Safety)