Global BRTData

    ABOUT
  BRT
DATA

About Global BRTData

The BRTData is a Project of Across Latitudes and Cultures – Bus Rapid Transit (ALC-BRT), a Centre of Excellence for Bus Rapid Transit. The platform construction and data collect are the result of a partnership between the ALC-BRT members, the International Energy Agency (IEA) and the Latin American Association of Integrated Transport Systems and BRT (SIBRT). Currently, the BRTData is managed and updated by WRI Brasil Sustainable Cities.

    FIND
  YOUR
SYSTEM

BY CITY

    FIND
  YOUR
INDICATOR

SYSTEM

Report

Rosario, Argentina

 

Rosario has 909,866 inhabitants. 34,3% of total trips are made by public transport, as showed in the graph below.

 

MODAL SPLIT - ROSARIO

The city has started the system in 2012 and now counts with 3 bus priority corridors consisting of 9 kilometers and benefiting 200,000 passengers every day. The average operational speed of the system is 15,0 km/h.

 

SYSTEM LENGTH IN RELATION TO Argentina

 

DAILY DEMAND IN RELATION TO Argentina

Some technical details about corridors are presented in the table below.

 

 

Corridor NameDaily demand, corridor (passengers per day)Corridor length (km)Stations, corridorPre-board fare collection, corridorOvertaking lanes, corridorStation boarding level, corridorOperating speed, corridor
Santa Fé - Maipú 4,70 16 None Partial On-street, no level boarding 15,0
San Lorenzo - Laprida 3,20 8 None None On-street, no level boarding 15,0
Córdoba 1,70 6 None None On-street, no level boarding 15,0

Curiosities

SYSTEM Indicators

Indicator Value Date Source
GDP per capita (US$) (General info) 12,751 2014 databank.worldbank.org
Population, city (General info) 909,866 2010 www.rosario.gov.ar
Population, metro area (General info) 1,246,378 2010 es.wikipedia.org
Population density, metropolitan area (General info) 2.116,1 2010 es.wikipedia.org
Modal split % public transport (General info) 34,3 2008 www.ptuba.gov.ar
Modal split % private transport (General info) 36,0 2008 www.ptuba.gov.ar
Modal split % non motorized (General info) 29,7 2008 www.ptuba.gov.ar
System name (System info)
Corridors (System info) 3 2012 www.rosario.gov.ar
Year system commenced (System info) 2012 www.rosario.gov.ar
Transit agency (System info) EMR (Ente de la Movilidad de Rosario) 2013 www.rosario.gov.ar
Standard fare (US$) (System info) 0,64 2016 www.rosario.gov.ar
Annual fare revenue (US$ millions) (System info) 26,69 Calculated using annual demand and fare
Fare integration within the system (System info) Yes 2013 www.etr.gov.ar
Citywide fare integration (other modes) (System info) Yes 2013 www.etr.gov.ar
Integration terminals (System info) 0 2013
Transfer stations (System info) 0 2013
Peak load (passengers per hour per direction) (System info)
Daily demand (passengers per day) (System info) 200,000 2013 www.rosario.gov.ar
Annual demand (passengers per year) (System info) 60,000,000 2013 Calculated using daily demand and 300 working days
Capital productivity (boardings per bus per day) (System info)
Operational productivity (IPK) (System info)
Operations control center (System info) All 2013 www.etr.gov.ar
Trunk lines (System info) 36 2013 www.etr.gov.ar
Feeder routes (System info) 0 2013
Depots (System info)
System length (km) (Additional Information) 9,60 2013, one direction ssl.rosario.gov.ar
Position of with-flow lanes (Additional Information) Curbside 2013 www.atc-rosario.com.ar
Position of counterflow lanes (Additional Information) N/A 2013 ssl.rosario.gov.ar
Position of bus doors (Additional Information) Right 2013 www.rosario.gov.ar
Lane material on running ways (Additional Information) Asphalt 2013 www.rosario.gov.ar
Lane material at stations (Additional Information) Asphalt 2013 www.rosario.gov.ar
Stations (Additional Information) 30 2013 www.rosario.gov.ar
Station spacing (m) (Additional Information) 320,0 Calculated using system length and stations
Pre-board fare collection (Additional Information) None 2013 www.dagostinoferrari.com.ar
Overtaking lanes (Additional Information) Partial 2013
Station boarding level (Additional Information) On-street, no level boarding 2013 www.dagostinoferrari.com.ar
Real time information (Additional Information) Partial 2013 www.etr.gov.ar
Peak frequency (buses per hour) (Additional Information)
Operating speed (Additional Information) 15,0 2013 ar.finanzas.yahoo.com
Total fleet (System fleet)
Fleet, standard buses (System fleet)
Average age, standard buses (System fleet)
Propulsion, standard buses (System fleet)
Fuel type, standard buses (System fleet)
Fuel economy, standard buses (System fleet)
Fleet, articulated buses (System fleet)
Average age, articulated buses (System fleet)
Propulsion, articulated buses (System fleet)
Fuel type, articulated buses (System fleet)
Fuel economy, articulated buses (System fleet)
Fleet, bi-articulated buses (System fleet) 0 2014
Average age, bi-articulated buses (System fleet) N/A 2014
Propulsion, bi-articulated buses (System fleet) N/A 2014
Fuel type, bi-articulated buses (System fleet) N/A 2014
Fuel economy, bi-articulated buses (System fleet) N/A 2014
Fleet, double-decker buses (System fleet) 0 2014
Average age, double-decker buses (System fleet) N/A 2014
Propulsion, double-decker buses (System fleet) N/A 2014
Fuel type, double-decker buses (System fleet) N/A 2014
Fuel economy, double-decker buses (System fleet) N/A 2014
Typical fuel type (System fleet)
City's diesel sulfur content (ppm) (System fleet)
Total cost per kilometer (US$ million per km) (System cost)
Planning cost (US$ million) (System cost)
Capital cost per kilometer (US$ million per km) (System cost)
Infrastructure cost per kilometer (US$ million per km) (System cost)
Equipment cost (US$ million) (System cost)
Annual operational cost (US$ million) (System cost)
User rating (System image)
Brand and logo (System image) No 2013
Unique bus livery (System image) No 2013
Citywide annual road fatalities (System road safety)
Citywide annual injuries (System road safety)

CORRIDOR Indicators - Santa Fé - Maipú

Indicator Value Date Source
Corridor Name (Corridor info) Santa Fé - Maipú www.rosario.gov.ar
Year corridor commenced (Corridor info) 2012 www.rosario.gov.ar
Corridor service (Corridor info) Conventional bus services 2013 conventional bus services
Peak load, corridor (passengers per hour per direction) (Corridor info)
Daily demand, corridor (passengers per day) (Corridor info)
Trunk lines, corridor (Corridor info) 15 2013 www.etr.gov.ar
Corridor length (km) (Running ways) 4,70 2013, one direction ssl.rosario.gov.ar
Length of segregated lanes, corridor (km) (Running ways) 4,70 2013 ssl.rosario.gov.ar
Length of segregated counterflow lanes, corridor (km) (Running ways) 0,00 2013 ssl.rosario.gov.ar
Length of exclusive lanes, corridor (km) (Running ways) 0,00 2013 ssl.rosario.gov.ar
Mixed traffic with-flow length, corridor (km) (Running ways) 0,00 2013 ssl.rosario.gov.ar
Position of with-flow lanes, corridor (Running ways) Curbside 2013 www.atc-rosario.com.ar
Position of counterflow lanes, corridor (Running ways) N/A 2013 ssl.rosario.gov.ar
Position of bus doors, corridor (Running ways) Right 2013 www.rosario.gov.ar
Lane material on running ways, corridor (Running ways) Asphalt 2013 www.rosario.gov.ar
Lane material at stations, corridor (Running ways) Asphalt 2013 www.rosario.gov.ar
Grade-separated intersections, corridor (Traffic engineering) None 2013 www.rosario.gov.ar
Fixed signal priority (Traffic engineering) None 2013
Dynamic signal priority (Traffic engineering) None 2013
Stations, corridor (Stations) 16 2013 www.rosario.gov.ar
Station spacing, corridor (m) (Stations) 293,8 2013 Calculated using corridor length and stations
Enhanced stations (Stations) No 2013 www.dagostinoferrari.com.ar
Pre-board fare collection, corridor (Stations) None 2013 www.dagostinoferrari.com.ar
Overtaking lanes, corridor (Stations) Partial 2013 www.atc-rosario.com.ar
Station boarding level, corridor (Stations) On-street, no level boarding 2013 www.dagostinoferrari.com.ar
Type of bus guidance (ITS) None 2013
Peak frequency, corridor (buses per hour per direction) (Travel time)
Operating speed, corridor (Travel time) 15,0 2013 ar.finanzas.yahoo.com
Express services (Travel time) No 2013 www.etr.gov.ar
Speed limit (km/h) (Travel time)
Real time information, corridor (Comfort) Partial 2013 www.etr.gov.ar
Physically integrated feeders (Comfort) No 2013
Total cost per kilometer, corridor (US$ million per km) (Cost)
Planning cost, corridor (US$ million) (Cost)
Infrastructure cost per kilometer, corridor (US$ million per km) (Cost)
User rating, corridor (Quality of service)
Corridor annual fatalities (Road Safety)

CORRIDOR Indicators - San Lorenzo - Laprida

Indicator Value Date Source
Corridor Name (Corridor info) San Lorenzo - Laprida www.rosario.gov.ar
Year corridor commenced (Corridor info) 2012 www.rosario.gov.ar
Corridor service (Corridor info) Conventional bus services 2013 conventional bus services
Peak load, corridor (passengers per hour per direction) (Corridor info)
Daily demand, corridor (passengers per day) (Corridor info)
Trunk lines, corridor (Corridor info) 14 2013 www.etr.gov.ar
Corridor length (km) (Running ways) 3,20 2013, one direction ssl.rosario.gov.ar
Length of segregated lanes, corridor (km) (Running ways) 3,20 2013 ssl.rosario.gov.ar
Length of segregated counterflow lanes, corridor (km) (Running ways) 0,00 2013 ssl.rosario.gov.ar
Length of exclusive lanes, corridor (km) (Running ways) 0,00 2013 ssl.rosario.gov.ar
Mixed traffic with-flow length, corridor (km) (Running ways) 0,00 2013 ssl.rosario.gov.ar
Position of with-flow lanes, corridor (Running ways) Curbside 2013 www.atc-rosario.com.ar
Position of counterflow lanes, corridor (Running ways) N/A 2013 ssl.rosario.gov.ar
Position of bus doors, corridor (Running ways) Right 2013 www.rosario.gov.ar
Lane material on running ways, corridor (Running ways) Asphalt 2013 www.rosario.gov.ar
Lane material at stations, corridor (Running ways) Asphalt 2013 www.rosario.gov.ar
Grade-separated intersections, corridor (Traffic engineering) None 2013 www.rosario.gov.ar
Fixed signal priority (Traffic engineering) None 2013
Dynamic signal priority (Traffic engineering) None 2013
Stations, corridor (Stations) 8 2013 www.rosario.gov.ar
Station spacing, corridor (m) (Stations) 400,0 2013 Calculated using corridor length and stations
Enhanced stations (Stations) No 2013 www.dagostinoferrari.com.ar
Pre-board fare collection, corridor (Stations) None 2013 www.dagostinoferrari.com.ar
Overtaking lanes, corridor (Stations) None 2013 www.atc-rosario.com.ar
Station boarding level, corridor (Stations) On-street, no level boarding 2013 www.dagostinoferrari.com.ar
Type of bus guidance (ITS) None 2013
Peak frequency, corridor (buses per hour per direction) (Travel time)
Operating speed, corridor (Travel time) 15,0 2013 ar.finanzas.yahoo.com
Express services (Travel time) No 2013 www.etr.gov.ar
Speed limit (km/h) (Travel time)
Real time information, corridor (Comfort) Partial 2013 www.etr.gov.ar
Physically integrated feeders (Comfort) No 2013
Total cost per kilometer, corridor (US$ million per km) (Cost)
Planning cost, corridor (US$ million) (Cost)
Infrastructure cost per kilometer, corridor (US$ million per km) (Cost)
User rating, corridor (Quality of service)
Corridor annual fatalities (Road Safety)

CORRIDOR Indicators - Córdoba

Indicator Value Date Source
Corridor Name (Corridor info) Córdoba www.rosario.gov.ar
Year corridor commenced (Corridor info) 2012 www.rosario.gov.ar
Corridor service (Corridor info) Conventional bus services 2013 conventional bus services
Peak load, corridor (passengers per hour per direction) (Corridor info)
Daily demand, corridor (passengers per day) (Corridor info)
Trunk lines, corridor (Corridor info) 7 2013 www.etr.gov.ar
Corridor length (km) (Running ways) 1,70 2013, one direction ssl.rosario.gov.ar
Length of segregated lanes, corridor (km) (Running ways) 1,70 2013 ssl.rosario.gov.ar
Length of segregated counterflow lanes, corridor (km) (Running ways) 0,00 2013 ssl.rosario.gov.ar
Length of exclusive lanes, corridor (km) (Running ways) 0,00 2013 ssl.rosario.gov.ar
Mixed traffic with-flow length, corridor (km) (Running ways) 0,00 2013 ssl.rosario.gov.ar
Position of with-flow lanes, corridor (Running ways) Curbside 2013 www.atc-rosario.com.ar
Position of counterflow lanes, corridor (Running ways) N/A 2013 ssl.rosario.gov.ar
Position of bus doors, corridor (Running ways) Right 2013 www.rosario.gov.ar
Lane material on running ways, corridor (Running ways) Asphalt 2013 www.rosario.gov.ar
Lane material at stations, corridor (Running ways) Asphalt 2013 www.rosario.gov.ar
Grade-separated intersections, corridor (Traffic engineering) None 2013 www.rosario.gov.ar
Fixed signal priority (Traffic engineering) None 2013
Dynamic signal priority (Traffic engineering) None 2013
Stations, corridor (Stations) 6 2013 www.rosario.gov.ar
Station spacing, corridor (m) (Stations) 283,3 2013 Calculated using corridor length and stations
Enhanced stations (Stations) No 2013 www.dagostinoferrari.com.ar
Pre-board fare collection, corridor (Stations) None 2013 www.dagostinoferrari.com.ar
Overtaking lanes, corridor (Stations) None 2013 www.atc-rosario.com.ar
Station boarding level, corridor (Stations) On-street, no level boarding 2013 www.dagostinoferrari.com.ar
Type of bus guidance (ITS) None 2013
Peak frequency, corridor (buses per hour per direction) (Travel time)
Operating speed, corridor (Travel time) 15,0 2013 ar.finanzas.yahoo.com
Express services (Travel time) No 2013 www.etr.gov.ar
Speed limit (km/h) (Travel time)
Real time information, corridor (Comfort) Partial 2013 www.etr.gov.ar
Physically integrated feeders (Comfort) No 2013
Total cost per kilometer, corridor (US$ million per km) (Cost)
Planning cost, corridor (US$ million) (Cost)
Infrastructure cost per kilometer, corridor (US$ million per km) (Cost)
User rating, corridor (Quality of service)
Corridor annual fatalities (Road Safety)