Global BRTData

    ABOUT
  BRT
DATA

About Global BRTData

The BRTData is a Project of Across Latitudes and Cultures – Bus Rapid Transit (ALC-BRT), a Centre of Excellence for Bus Rapid Transit. The platform construction and data collect are the result of a partnership between the ALC-BRT members, the International Energy Agency (IEA) and the Latin American Association of Integrated Transport Systems and BRT (SIBRT). Currently, the BRTData is managed and updated by WRI Brasil Sustainable Cities.

    FIND
  YOUR
SYSTEM

BY CITY

    FIND
  YOUR
INDICATOR

SYSTEM

Report

Stockton, United States - metro express

 

Stockton has 302,389 inhabitants. 1% of total trips are made by public transport, as showed in the graph below.

 

MODAL SPLIT - STOCKTON

The city has started the system in 2007 and now counts with 3 bus priority corridors consisting of 26 kilometers and benefiting 5,322 passengers every day.

 

SYSTEM LENGTH IN RELATION TO United States

 

DAILY DEMAND IN RELATION TO United States

Some technical details about corridors are presented in the table below.

 

 

Corridor NameDaily demand, corridor (passengers per day)Corridor length (km)Stations, corridorPre-board fare collection, corridorOvertaking lanes, corridorStation boarding level, corridorOperating speed, corridor
Route #40 - Pacific Corridor 3,236 8,85 8 All On-street, no level boarding
Route #43 - Hammer Corridor 1,120 8,52 14 All On-street, no level boarding
Route #44 - Airport Corridor 966 8,85 8 All On-street, no level boarding

Curiosities

SYSTEM Indicators

Indicator Value Date Source
GDP per capita (US$) (General info) 55,837 2015 databank.worldbank.org
Population, city (General info) 302,389 2014, estimated by US Census Bureau factfinder.census.gov
Population, metro area (General info) 687,036 2014 www.bestplaces.net
Population density, metropolitan area (General info) 494 2014 www.bestplaces.net
Modal split % public transport (General info) 1 2006 www.stancog.org
Modal split % private transport (General info) 96 2006 www.stancog.org
Modal split % non motorized (General info) 3 2006 www.stancog.org
System name (System info) Metro Express 2015 www.sanjoaquinrtd.com
Corridors (System info) 3 2015 www.sanjoaquinrtd.com
Year system commenced (System info) 2007 www.sanjoaquinrtd.com
Transit agency (System info) San Joaquin Regional Transit District’s (RTD) 2015 www.sanjoaquinrtd.com
Standard fare (US$) (System info) 1,50 2015 www.sanjoaquinrtd.com
Annual fare revenue (US$ millions) (System info) 1,68 Calculated using annual demand and fare
Fare integration within the system (System info) Yes 2015 www.sanjoaquinrtd.com
Citywide fare integration (other modes) (System info)
Integration terminals (System info)
Transfer stations (System info)
Peak load (passengers per hour per direction) (System info)
Daily demand (passengers per day) (System info) 5,322 2012 San Joaquin Regional Transit District (RTD)
Annual demand (passengers per year) (System info) 1,596,600 2012 Calculated using daily demand and 300 working days
Capital productivity (boardings per bus per day) (System info)
Operational productivity (IPK) (System info)
Operations control center (System info)
Trunk lines (System info) 3 2015 www.sanjoaquinrtd.com
Feeder routes (System info)
Depots (System info)
System length (km) (Additional Information) 26,22 2012 San Joaquin Regional Transit District (RTD)
Position of with-flow lanes (Additional Information) Curbside 2015 www.youtube.com
Position of counterflow lanes (Additional Information) N/A 2015 www.youtube.com
Position of bus doors (Additional Information) Right 2015 www.youtube.com
Lane material on running ways (Additional Information) Asphalt 2015 www.youtube.com
Lane material at stations (Additional Information) Asphalt & Concrete 2015 www.youtube.com
Stations (Additional Information) 30 2015 www.sanjoaquinrtd.com
Station spacing (m) (Additional Information) 874,0 2015 www.sanjoaquinrtd.com
Pre-board fare collection (Additional Information) All 2015 www.youtube.com
Overtaking lanes (Additional Information)
Station boarding level (Additional Information) On-street, no level boarding 2015 www.youtube.com
Real time information (Additional Information)
Peak frequency (buses per hour) (Additional Information) 13 2015 www.sanjoaquinrtd.com
Operating speed (Additional Information)
Total fleet (System fleet) 20 2015 www.sanjoaquinrtd.com
Fleet, standard buses (System fleet) 14 2015 www.sanjoaquinrtd.com
Average age, standard buses (System fleet)
Propulsion, standard buses (System fleet) Electric 2015 www.sanjoaquinrtd.com
Fuel type, standard buses (System fleet) Hybrid 2015 (Hybrid: diesel-electricity) www.sanjoaquinrtd.com
Fuel economy, standard buses (System fleet)
Fleet, articulated buses (System fleet) 6 2015 www.youtube.com
Average age, articulated buses (System fleet) 1,0 2015 www.youtube.com
Propulsion, articulated buses (System fleet) Hybrid 2015 www.youtube.com
Fuel type, articulated buses (System fleet) Hybrid 2015 (Hybrid: diesel-electricity) www.youtube.com
Fuel economy, articulated buses (System fleet)
Fleet, bi-articulated buses (System fleet) 0 2015 www.sanjoaquinrtd.com
Average age, bi-articulated buses (System fleet) N/A 2015 www.youtube.com
Propulsion, bi-articulated buses (System fleet) N/A 2015 www.youtube.com
Fuel type, bi-articulated buses (System fleet) N/A 2015 www.youtube.com
Fuel economy, bi-articulated buses (System fleet) N/A 2015 www.youtube.com
Fleet, double-decker buses (System fleet) 0 2015 www.youtube.com
Average age, double-decker buses (System fleet) N/A 2015 www.youtube.com
Propulsion, double-decker buses (System fleet) N/A 2015 www.youtube.com
Fuel type, double-decker buses (System fleet) N/A 2015 www.youtube.com
Fuel economy, double-decker buses (System fleet) N/A 2015 www.youtube.com
Typical fuel type (System fleet) Hybrid 2015 (Hybrid: diesel-electricity) www.sanjoaquinrtd.com
City's diesel sulfur content (ppm) (System fleet)
Total cost per kilometer (US$ million per km) (System cost)
Planning cost (US$ million) (System cost)
Capital cost per kilometer (US$ million per km) (System cost)
Infrastructure cost per kilometer (US$ million per km) (System cost)
Equipment cost (US$ million) (System cost)
Annual operational cost (US$ million) (System cost)
User rating (System image)
Brand and logo (System image) Yes 2015 www.youtube.com
Unique bus livery (System image) Yes 2015 www.youtube.com
Citywide annual road fatalities (System road safety)
Citywide annual injuries (System road safety)

CORRIDOR Indicators - Route #40 - Pacific Corridor

Indicator Value Date Source
Corridor Name (Corridor info) Route #40 - Pacific Corridor San Joaquin Regional Transit District (RTD)
Year corridor commenced (Corridor info) 2007 www.youtube.com
Corridor service (Corridor info) Trunk lines 2015 www.youtube.com
Peak load, corridor (passengers per hour per direction) (Corridor info)
Daily demand, corridor (passengers per day) (Corridor info) 3,236 2012 San Joaquin Regional Transit District (RTD)
Trunk lines, corridor (Corridor info) 1 2015 www.youtube.com
Corridor length (km) (Running ways) 8,85 2012 San Joaquin Regional Transit District (RTD)
Length of segregated lanes, corridor (km) (Running ways) 0,00 2017 Google Earth
Length of segregated counterflow lanes, corridor (km) (Running ways) 0,00 2017 Google Earth
Length of exclusive lanes, corridor (km) (Running ways) 0,00 2017 Google Earth
Mixed traffic with-flow length, corridor (km) (Running ways) 8,85 2012 San Joaquin Regional Transit District (RTD)
Position of with-flow lanes, corridor (Running ways) Curbside 2015 www.youtube.com
Position of counterflow lanes, corridor (Running ways) N/A 2015 www.youtube.com
Position of bus doors, corridor (Running ways) Right 2015 www.youtube.com
Lane material on running ways, corridor (Running ways) Asphalt 2015 www.youtube.com
Lane material at stations, corridor (Running ways) Asphalt & Concrete 2015 www.youtube.com
Grade-separated intersections, corridor (Traffic engineering)
Fixed signal priority (Traffic engineering)
Dynamic signal priority (Traffic engineering) All 2015 www.youtube.com
Stations, corridor (Stations) 8 2015 www.sanjoaquinrtd.com
Station spacing, corridor (m) (Stations) 1,1 2015 www.sanjoaquinrtd.com
Enhanced stations (Stations) Yes 2015 www.youtube.com
Pre-board fare collection, corridor (Stations) All 2015 www.youtube.com
Overtaking lanes, corridor (Stations)
Station boarding level, corridor (Stations) On-street, no level boarding 2015 www.youtube.com
Type of bus guidance (ITS) None 2015 www.youtube.com
Peak frequency, corridor (buses per hour per direction) (Travel time) 6 2015 www.sanjoaquinrtd.com
Operating speed, corridor (Travel time)
Express services (Travel time)
Speed limit (km/h) (Travel time)
Real time information, corridor (Comfort)
Physically integrated feeders (Comfort)
Total cost per kilometer, corridor (US$ million per km) (Cost)
Planning cost, corridor (US$ million) (Cost)
Infrastructure cost per kilometer, corridor (US$ million per km) (Cost)
User rating, corridor (Quality of service)
Corridor annual fatalities (Road Safety)

CORRIDOR Indicators - Route #43 - Hammer Corridor

Indicator Value Date Source
Corridor Name (Corridor info) Route #43 - Hammer Corridor San Joaquin Regional Transit District (RTD)
Year corridor commenced (Corridor info) 2012 www.youtube.com
Corridor service (Corridor info) Trunk lines 2015 www.youtube.com
Peak load, corridor (passengers per hour per direction) (Corridor info)
Daily demand, corridor (passengers per day) (Corridor info) 1,120 2012 San Joaquin Regional Transit District (RTD)
Trunk lines, corridor (Corridor info) 1 2015 www.youtube.com
Corridor length (km) (Running ways) 8,52 2012 San Joaquin Regional Transit District (RTD)
Length of segregated lanes, corridor (km) (Running ways) 0,00 2017 Google Earth
Length of segregated counterflow lanes, corridor (km) (Running ways) 0,00 2017 Google Earth
Length of exclusive lanes, corridor (km) (Running ways) 0,00 2017 Google Earth
Mixed traffic with-flow length, corridor (km) (Running ways) 8,52 2012 San Joaquin Regional Transit District (RTD)
Position of with-flow lanes, corridor (Running ways) Curbside 2015 www.youtube.com
Position of counterflow lanes, corridor (Running ways) N/A 2015 www.youtube.com
Position of bus doors, corridor (Running ways) Right 2015 www.youtube.com
Lane material on running ways, corridor (Running ways) Asphalt 2015 www.youtube.com
Lane material at stations, corridor (Running ways) Asphalt & Concrete 2015 www.youtube.com
Grade-separated intersections, corridor (Traffic engineering)
Fixed signal priority (Traffic engineering)
Dynamic signal priority (Traffic engineering) All 2015 www.youtube.com
Stations, corridor (Stations) 14 2015 www.sanjoaquinrtd.com
Station spacing, corridor (m) (Stations) 0,6 2015 www.sanjoaquinrtd.com
Enhanced stations (Stations) Yes 2015 www.youtube.com
Pre-board fare collection, corridor (Stations) All 2015 www.youtube.com
Overtaking lanes, corridor (Stations)
Station boarding level, corridor (Stations) On-street, no level boarding 2015 www.youtube.com
Type of bus guidance (ITS) None 2015 www.youtube.com
Peak frequency, corridor (buses per hour per direction) (Travel time) 4 2015 www.sanjoaquinrtd.com
Operating speed, corridor (Travel time)
Express services (Travel time)
Speed limit (km/h) (Travel time)
Real time information, corridor (Comfort)
Physically integrated feeders (Comfort)
Total cost per kilometer, corridor (US$ million per km) (Cost)
Planning cost, corridor (US$ million) (Cost)
Infrastructure cost per kilometer, corridor (US$ million per km) (Cost)
User rating, corridor (Quality of service)
Corridor annual fatalities (Road Safety)

CORRIDOR Indicators - Route #44 - Airport Corridor

Indicator Value Date Source
Corridor Name (Corridor info) Route #44 - Airport Corridor San Joaquin Regional Transit District (RTD)
Year corridor commenced (Corridor info) 2011 www.youtube.com
Corridor service (Corridor info) Trunk lines 2015 www.youtube.com
Peak load, corridor (passengers per hour per direction) (Corridor info)
Daily demand, corridor (passengers per day) (Corridor info) 966 2012 San Joaquin Regional Transit District (RTD)
Trunk lines, corridor (Corridor info) 1 2015 www.youtube.com
Corridor length (km) (Running ways) 8,85 2012 San Joaquin Regional Transit District (RTD)
Length of segregated lanes, corridor (km) (Running ways) 0,00 2017 Google Earth
Length of segregated counterflow lanes, corridor (km) (Running ways) 0,00 2017 Google Earth
Length of exclusive lanes, corridor (km) (Running ways) 0,00 2017 Google Earth
Mixed traffic with-flow length, corridor (km) (Running ways) 8,85 2012 San Joaquin Regional Transit District (RTD)
Position of with-flow lanes, corridor (Running ways) Curbside 2015 www.youtube.com
Position of counterflow lanes, corridor (Running ways) N/A 2015 www.youtube.com
Position of bus doors, corridor (Running ways) Right 2015 www.youtube.com
Lane material on running ways, corridor (Running ways) Asphalt 2015 www.youtube.com
Lane material at stations, corridor (Running ways) Asphalt & Concrete 2015 www.youtube.com
Grade-separated intersections, corridor (Traffic engineering)
Fixed signal priority (Traffic engineering)
Dynamic signal priority (Traffic engineering) All 2015 www.youtube.com
Stations, corridor (Stations) 8 2014 www.sanjoaquinrtd.com
Station spacing, corridor (m) (Stations) 1,1 2015 www.sanjoaquinrtd.com
Enhanced stations (Stations) Yes 2015 www.youtube.com
Pre-board fare collection, corridor (Stations) All 2015 www.youtube.com
Overtaking lanes, corridor (Stations)
Station boarding level, corridor (Stations) On-street, no level boarding 2015 www.youtube.com
Type of bus guidance (ITS) None 2015 www.youtube.com
Peak frequency, corridor (buses per hour per direction) (Travel time) 3 2015 www.sanjoaquinrtd.com
Operating speed, corridor (Travel time)
Express services (Travel time)
Speed limit (km/h) (Travel time)
Real time information, corridor (Comfort)
Physically integrated feeders (Comfort)
Total cost per kilometer, corridor (US$ million per km) (Cost)
Planning cost, corridor (US$ million) (Cost)
Infrastructure cost per kilometer, corridor (US$ million per km) (Cost)
User rating, corridor (Quality of service)
Corridor annual fatalities (Road Safety)

Please, answer the questions below to start your download.

1

2

3

Thank you for answer.

Please, read the information below to start your download.

Thank you for filling out the questions.

If you prefer, you can download a full version of BRT DATA with worldwide data.
Download it here in Excel or CSV.

After you click the download button, your download will start automatically when the conversion process (it can take up to 30 seconds) is complete.