GDP per capita (US$) (General info) |
51692.8 |
2020 |
databank.worldbank.org |
Population, city (General info) |
1,970,000 |
2010 |
UN Habitat |
Population, metro area (General info) |
2,065,996 |
2011 |
www.censusdata.abs.gov.au |
Population density, metropolitan area (General info) |
347.2 |
2011 |
|
Modal split % public transport (General info) |
15.3 |
2011 |
mams.rmit.edu.au |
Modal split % private transport (General info) |
78.5 |
2011 |
mams.rmit.edu.au |
Modal split % non motorized (General info) |
6.2 |
2011 |
mams.rmit.edu.au |
System name (System info) |
Brisbane Busway |
|
|
Corridors (System info) |
3 |
2014 |
Currie G. and Delbosc A., "Bus Rapid Transit in Australasia: An Update on Progress", Built Environment Vol 36, No. 3, 2010 |
Year system commenced (System info) |
2000 |
|
www.tmr.qld.gov.au |
Transit agency (System info) |
Translink |
2014 |
translink.com.au |
Standard fare (US$) (System info) |
4.01 |
2023, zone 2, fare with prepaid card is US$2.77 |
translink.com.au |
Annual fare revenue (US$ millions) (System info) |
421.1 |
2023 |
Calculated using annual demand and fare |
Fare integration within the system (System info) |
Yes |
2014 |
translink.com.au |
Citywide fare integration (other modes) (System info) |
Yes |
2014 |
translink.com.au |
Integration terminals (System info) |
|
|
|
Transfer stations (System info) |
|
|
|
Peak load (passengers per hour per direction) (System info) |
19,900 |
2012 |
Currie G and Delbosc. A - Assessing bus rapid transit system performance in Australasia |
Daily demand (passengers per day) (System info) |
356,800 |
2012 |
Currie G and Delbosc. A - Assessing bus rapid transit system performance in Australasia |
Annual demand (passengers per year) (System info) |
105,000,000 |
2012 |
Currie G and Delbosc. A - Assessing bus rapid transit system performance in Australasia |
Capital productivity (boardings per bus per day) (System info) |
|
|
|
Operational productivity (IPK) (System info) |
1.4 |
2009 |
Currie G and Delbosc. A - Assessing bus rapid transit system performance in Australasia |
Operations control center (System info) |
All |
2014 |
Translink |
Trunk lines (System info) |
|
|
|
Feeder routes (System info) |
|
|
|
Depots (System info) |
|
|
|
System length (km) (Additional Information) |
28.4 |
2013 |
Currie G and Delbosc. A - Assessing bus rapid transit system performance in Australasia |
Position of with-flow lanes (Additional Information) |
Separated ROW |
2014 |
Google Maps |
Position of counterflow lanes (Additional Information) |
N/A |
2014 |
Google Maps |
Position of bus doors (Additional Information) |
Left |
2011 |
Bus Rapid Transit Planning Guide (ITDP) 2007 and www.chinabrt.org |
Lane material on running ways (Additional Information) |
Asphalt |
2014 |
Google Maps |
Lane material at stations (Additional Information) |
Concrete |
2014 |
Google Maps |
Stations (Additional Information) |
25 |
2013 |
Currie G and Delbosc. A - Assessing bus rapid transit system performance in Australasia |
Station spacing (m) (Additional Information) |
1,153 |
2014 |
Calculated using system length and stations |
Pre-board fare collection (Additional Information) |
None |
2014 |
Translink |
Overtaking lanes (Additional Information) |
All |
2014 |
Google Maps |
Station boarding level (Additional Information) |
On-street, no level boarding |
2013 |
Currie G and Delbosc. A - Assessing bus rapid transit system performance in Australasia |
Real time information (Additional Information) |
All |
2013 |
Currie G and Delbosc. A - Assessing bus rapid transit system performance in Australasia |
Peak frequency (buses per hour) (Additional Information) |
295 |
2013 |
Currie G and Delbosc. A - Assessing bus rapid transit system performance in Australasia |
Operating speed (Additional Information) |
37.5 |
2013 |
Currie G and Delbosc. A - Assessing bus rapid transit system performance in Australasia |
Total fleet (System fleet) |
475 |
2007 |
Bus Rapid Transit Planning Guide (ITDP) 2007 / www.chinabrt.org |
Fleet, standard buses (System fleet) |
|
|
|
Average age, standard buses (System fleet) |
|
|
|
Propulsion, standard buses (System fleet) |
|
|
|
Fuel type, standard buses (System fleet) |
|
|
|
Fuel economy, standard buses (System fleet) |
|
|
|
Fleet, articulated buses (System fleet) |
|
|
|
Average age, articulated buses (System fleet) |
|
|
|
Propulsion, articulated buses (System fleet) |
|
|
|
Fuel type, articulated buses (System fleet) |
|
|
|
Fuel economy, articulated buses (System fleet) |
|
|
|
Fleet, bi-articulated buses (System fleet) |
0 |
2013 |
|
Average age, bi-articulated buses (System fleet) |
N/A |
|
|
Propulsion, bi-articulated buses (System fleet) |
N/A |
|
|
Fuel type, bi-articulated buses (System fleet) |
N/A |
|
|
Fuel economy, bi-articulated buses (System fleet) |
N/A |
|
|
Fleet, double-decker buses (System fleet) |
0 |
2013 |
|
Average age, double-decker buses (System fleet) |
N/A |
|
|
Propulsion, double-decker buses (System fleet) |
N/A |
|
|
Fuel type, double-decker buses (System fleet) |
N/A |
|
|
Fuel economy, double-decker buses (System fleet) |
N/A |
|
|
Typical fuel type (System fleet) |
CNG & Diesel |
2011 |
Bus Rapid Transit Planning Guide (ITDP) 2007 and www.chinabrt.org |
City's diesel sulfur content (ppm) (System fleet) |
|
|
|
Total cost per kilometer (US$ million per km) (System cost) |
47.7 |
2009, calculated using corridors data |
|
Planning cost (US$ million) (System cost) |
|
|
|
Capital cost per kilometer (US$ million per km) (System cost) |
|
|
|
Infrastructure cost per kilometer (US$ million per km) (System cost) |
|
|
|
Equipment cost (US$ million) (System cost) |
|
|
|
Annual operational cost (US$ million) (System cost) |
|
|
|
User rating (System image) |
|
|
|
Brand and logo (System image) |
No |
2013 |
Currie G and Delbosc. A - Assessing bus rapid transit system performance in Australasia |
Unique bus livery (System image) |
No |
2013 |
Currie G and Delbosc. A - Assessing bus rapid transit system performance in Australasia |
Citywide annual road fatalities (System road safety) |
|
|
|
Citywide annual injuries (System road safety) |
|
|
|