GDP per capita (US$) (General info) |
41441.5 |
2020 |
databank.worldbank.org |
Population, city (General info) |
1,507,700 |
2012 |
www.stats.govt.nz |
Population, metro area (General info) |
1,507,700 |
2012 |
www.stats.govt.nz |
Population density, metropolitan area (General info) |
2,700 |
2012 |
|
Modal split % public transport (General info) |
3.5 |
2011 |
New Zealand Household Travel Survey 2003 - 2011 |
Modal split % private transport (General info) |
80.8 |
2011 |
New Zealand Household Travel Survey 2003 - 2011 |
Modal split % non motorized (General info) |
15.7 |
2011 |
New Zealand Household Travel Survey 2003 - 2011 |
System name (System info) |
Northern Busway |
|
|
Corridors (System info) |
1 |
2014 |
Currie G. and Delbosc A., "Bus Rapid Transit in Australasia: An Update on Progress", Built Environment Vol 36, No. 3, 2010 |
Year system commenced (System info) |
2008 |
|
www.aucklandmotorways.com |
Transit agency (System info) |
Auckland Transport |
2014 |
www.aucklandtransport.govt.nz |
Standard fare (US$) (System info) |
4.76 |
2023, fare to travel between 3 zones |
at.govt.nz |
Annual fare revenue (US$ millions) (System info) |
27.6 |
2023 |
Calculated using annual demand and fare |
Fare integration within the system (System info) |
Yes |
2014 |
www.athop.co.nz |
Citywide fare integration (other modes) (System info) |
Yes |
2014 |
www.athop.co.nz |
Integration terminals (System info) |
0 |
|
|
Transfer stations (System info) |
0 |
|
|
Peak load (passengers per hour per direction) (System info) |
2,200 |
2012 |
Currie G and Delbosc. A - Assessing bus rapid transit system performance in Australasia |
Daily demand (passengers per day) (System info) |
22,900 |
2012 |
Currie G and Delbosc. A - Assessing bus rapid transit system performance in Australasia |
Annual demand (passengers per year) (System info) |
5,800,000 |
2012 |
Currie G and Delbosc. A - Assessing bus rapid transit system performance in Australasia |
Capital productivity (boardings per bus per day) (System info) |
|
|
|
Operational productivity (IPK) (System info) |
|
|
|
Operations control center (System info) |
All |
2014 |
www.aucklandtransport.govt.nz |
Trunk lines (System info) |
|
|
|
Feeder routes (System info) |
|
|
|
Depots (System info) |
|
|
|
System length (km) (Additional Information) |
6.2 |
2014 |
www.maxx.co.nz |
Position of with-flow lanes (Additional Information) |
Separated ROW |
2013 |
Currie G and Delbosc. A - Assessing bus rapid transit system performance in Australasia |
Position of counterflow lanes (Additional Information) |
N/A |
2013 |
Currie G and Delbosc. A - Assessing bus rapid transit system performance in Australasia |
Position of bus doors (Additional Information) |
Left |
2014 |
Google Maps |
Lane material on running ways (Additional Information) |
Concrete |
2014 |
Google Maps |
Lane material at stations (Additional Information) |
Asphalt |
2014 |
Google Maps |
Stations (Additional Information) |
5 |
2014 |
www.maxx.co.nz |
Station spacing (m) (Additional Information) |
1,240 |
2014 |
Calculated using system length and stations |
Pre-board fare collection (Additional Information) |
None |
2014 |
Auckland Transport |
Overtaking lanes (Additional Information) |
All |
2014 |
Google Maps |
Station boarding level (Additional Information) |
On-street, no level boarding |
2013 |
Currie G and Delbosc. A - Assessing bus rapid transit system performance in Australasia |
Real time information (Additional Information) |
All |
2013 |
Currie G and Delbosc. A - Assessing bus rapid transit system performance in Australasia |
Peak frequency (buses per hour) (Additional Information) |
82 |
2013 |
Currie G and Delbosc. A - Assessing bus rapid transit system performance in Australasia |
Operating speed (Additional Information) |
31 |
2013 |
Currie G and Delbosc. A - Assessing bus rapid transit system performance in Australasia |
Total fleet (System fleet) |
|
|
|
Fleet, standard buses (System fleet) |
|
|
|
Average age, standard buses (System fleet) |
|
|
|
Propulsion, standard buses (System fleet) |
|
|
|
Fuel type, standard buses (System fleet) |
|
|
|
Fuel economy, standard buses (System fleet) |
|
|
|
Fleet, articulated buses (System fleet) |
0 |
2013 |
|
Average age, articulated buses (System fleet) |
N/A |
|
|
Propulsion, articulated buses (System fleet) |
N/A |
|
|
Fuel type, articulated buses (System fleet) |
N/A |
|
|
Fuel economy, articulated buses (System fleet) |
N/A |
|
|
Fleet, bi-articulated buses (System fleet) |
0 |
2013 |
|
Average age, bi-articulated buses (System fleet) |
N/A |
|
|
Propulsion, bi-articulated buses (System fleet) |
N/A |
|
|
Fuel type, bi-articulated buses (System fleet) |
N/A |
|
|
Fuel economy, bi-articulated buses (System fleet) |
N/A |
|
|
Fleet, double-decker buses (System fleet) |
|
|
|
Average age, double-decker buses (System fleet) |
|
|
|
Propulsion, double-decker buses (System fleet) |
|
|
|
Fuel type, double-decker buses (System fleet) |
|
|
|
Fuel economy, double-decker buses (System fleet) |
|
|
|
Typical fuel type (System fleet) |
|
|
|
City's diesel sulfur content (ppm) (System fleet) |
|
|
|
Total cost per kilometer (US$ million per km) (System cost) |
36.4 |
2008 |
www.aucklandcouncil.govt.nz |
Planning cost (US$ million) (System cost) |
|
|
|
Capital cost per kilometer (US$ million per km) (System cost) |
|
|
|
Infrastructure cost per kilometer (US$ million per km) (System cost) |
|
|
|
Equipment cost (US$ million) (System cost) |
|
|
|
Annual operational cost (US$ million) (System cost) |
|
|
|
User rating (System image) |
|
|
|
Brand and logo (System image) |
No |
2013 |
Currie G and Delbosc. A - Assessing bus rapid transit system performance in Australasia |
Unique bus livery (System image) |
No |
2013 |
Currie G and Delbosc. A - Assessing bus rapid transit system performance in Australasia |
Citywide annual road fatalities (System road safety) |
|
|
|
Citywide annual injuries (System road safety) |
|
|
|