GDP per capita (US$) (General info) |
39040.4 |
2020 |
databank.worldbank.org |
Population, city (General info) |
108,954 |
2010 |
www.insee.fr |
Population, metro area (General info) |
399,471 |
2010 |
www.insee.fr |
Population density, metropolitan area (General info) |
221.1 |
2010 |
www.insee.fr |
Modal split % public transport (General info) |
|
|
|
Modal split % private transport (General info) |
|
|
|
Modal split % non motorized (General info) |
|
|
|
System name (System info) |
Twisto TVR |
|
|
Corridors (System info) |
1 |
2009 |
www.nbrti.org |
Year system commenced (System info) |
2002 |
|
www.nbrti.org |
Transit agency (System info) |
|
|
|
Standard fare (US$) (System info) |
1.68 |
2023, valid for 1 hour |
www.twisto.fr |
Annual fare revenue (US$ millions) (System info) |
24.2 |
2023 |
Calculated using annual demand and fare |
Fare integration within the system (System info) |
|
|
|
Citywide fare integration (other modes) (System info) |
|
|
|
Integration terminals (System info) |
4 |
2010 |
ITDP (2007) Bus Rapid Transit Planning Guide and CERTU 2010 |
Transfer stations (System info) |
|
|
|
Peak load (passengers per hour per direction) (System info) |
|
|
|
Daily demand (passengers per day) (System info) |
48,000 |
2009 |
www.nbrti.org |
Annual demand (passengers per year) (System info) |
14,400,000 |
2009 |
Calculated using daily demand and 300 working days |
Capital productivity (boardings per bus per day) (System info) |
1,875 |
2010 |
ITDP (2007) Bus Rapid Transit Planning Guide and CERTU 2010 |
Operational productivity (IPK) (System info) |
|
|
|
Operations control center (System info) |
|
|
|
Trunk lines (System info) |
2 |
|
|
Feeder routes (System info) |
|
|
|
Depots (System info) |
1 |
2010 |
ITDP (2007) Bus Rapid Transit Planning Guide and CERTU 2010 |
System length (km) (Additional Information) |
15.7 |
2009 |
www.nbrti.org |
Position of with-flow lanes (Additional Information) |
Median |
2010 |
ITDP (2007) Bus Rapid Transit Planning Guide and CERTU 2010 |
Position of counterflow lanes (Additional Information) |
|
|
|
Position of bus doors (Additional Information) |
Right |
2010 |
ITDP (2007) Bus Rapid Transit Planning Guide and CERTU 2010 |
Lane material on running ways (Additional Information) |
Asphalt |
2010 |
ITDP (2007) Bus Rapid Transit Planning Guide and CERTU 2010 |
Lane material at stations (Additional Information) |
Asphalt & Concrete |
2010 |
ITDP (2007) Bus Rapid Transit Planning Guide and CERTU 2010 |
Stations (Additional Information) |
34 |
2009 |
www.nbrti.org |
Station spacing (m) (Additional Information) |
500 |
2010 |
ITDP (2007) Bus Rapid Transit Planning Guide and CERTU 2010 |
Pre-board fare collection (Additional Information) |
|
|
|
Overtaking lanes (Additional Information) |
None |
2016 |
Google Maps |
Station boarding level (Additional Information) |
Low-level platform |
2016 |
Google Maps |
Real time information (Additional Information) |
|
|
|
Peak frequency (buses per hour) (Additional Information) |
10 |
2010 |
ITDP (2007) Bus Rapid Transit Planning Guide and CERTU 2010 |
Operating speed (Additional Information) |
20 |
2010 |
ITDP (2007) Bus Rapid Transit Planning Guide and CERTU 2010 |
Total fleet (System fleet) |
24 |
2009 |
www.nbrti.org |
Fleet, standard buses (System fleet) |
|
|
|
Average age, standard buses (System fleet) |
|
|
|
Propulsion, standard buses (System fleet) |
|
|
|
Fuel type, standard buses (System fleet) |
|
|
|
Fuel economy, standard buses (System fleet) |
|
|
|
Fleet, articulated buses (System fleet) |
|
|
|
Average age, articulated buses (System fleet) |
|
|
|
Propulsion, articulated buses (System fleet) |
|
|
|
Fuel type, articulated buses (System fleet) |
|
|
|
Fuel economy, articulated buses (System fleet) |
|
|
|
Fleet, bi-articulated buses (System fleet) |
|
|
|
Average age, bi-articulated buses (System fleet) |
|
|
|
Propulsion, bi-articulated buses (System fleet) |
|
|
|
Fuel type, bi-articulated buses (System fleet) |
|
|
|
Fuel economy, bi-articulated buses (System fleet) |
|
|
|
Fleet, double-decker buses (System fleet) |
|
|
|
Average age, double-decker buses (System fleet) |
|
|
|
Propulsion, double-decker buses (System fleet) |
|
|
|
Fuel type, double-decker buses (System fleet) |
|
|
|
Fuel economy, double-decker buses (System fleet) |
|
|
|
Typical fuel type (System fleet) |
|
|
|
City's diesel sulfur content (ppm) (System fleet) |
|
|
|
Total cost per kilometer (US$ million per km) (System cost) |
31.7 |
2010 |
ITDP (2007) Bus Rapid Transit Planning Guide and CERTU 2010 |
Planning cost (US$ million) (System cost) |
190 |
2010 |
ITDP (2007) Bus Rapid Transit Planning Guide and CERTU 2010 |
Capital cost per kilometer (US$ million per km) (System cost) |
|
|
|
Infrastructure cost per kilometer (US$ million per km) (System cost) |
19.6 |
2010 |
ITDP (2007) Bus Rapid Transit Planning Guide and CERTU 2010 |
Equipment cost (US$ million) (System cost) |
4.8 |
2010, only trunk vehicles |
ITDP (2007) Bus Rapid Transit Planning Guide and CERTU 2010 |
Annual operational cost (US$ million) (System cost) |
|
|
|
User rating (System image) |
|
|
|
Brand and logo (System image) |
|
|
|
Unique bus livery (System image) |
|
|
|
Citywide annual road fatalities (System road safety) |
|
|
|
Citywide annual injuries (System road safety) |
|
|
|