Global BRTData

    ABOUT
  BRT
DATA

About Global BRTData

The BRTData gathers information on bus priority systems in cities around the world. The platform is source of research for academics, journalists, students and municipal technicians, as well as provides technical background for decision making regarding public transport.

The data presented contemplate BRT systems (Bus Rapid Transit - median-aligned and segregated bus lanes, pre-board fare collection, and platform-level boarding) and bus priority systems: cities with dedicated bus lanes, but without some of the elements of a BRT. The website allows the user to know the systems and corridors of each city, compare indicators and generate graphs.

The BRTData was developed by BRT+ CoE, a Center of Excellence in BRT, and by WRI, with collaboration of the Institute for Transportation and Development Policy (ITDP). The platform is monthly updated with reliable data and verified by WRI Brasil Ross Center for Sustainable Cities.

    FIND
  YOUR
SYSTEM

BY CITY

    FIND
  YOUR
INDICATOR

SYSTEM

Report

Guangzhou, China - guangzhou brt

 

Guangzhou has 6,780,000 inhabitants. 32% of total trips are made by public transport, as showed in the graph below.

 

MODAL SPLIT - GUANGZHOU

The city has started the system in 2010 and now counts with 1 bus priority corridors consisting of 23 kilometers and benefiting 850,000 passengers every day. The average operational speed of the system is 24.8 km/h.

 

SYSTEM LENGTH IN RELATION TO China

 

DAILY DEMAND IN RELATION TO China

Some technical details about corridors are presented in the table below.

 

 

Corridor NameDaily demand, corridor (passengers per day)Corridor length (km)Stations, corridorPre-board fare collection, corridorOvertaking lanes, corridorStation boarding level, corridorOperating speed, corridor
Zhongshan Avenue 850,000 22.9 26 All All Low-level platform 24.8

Curiosities

SYSTEM Indicators

Indicator Value Date Source
GDP per capita (US$) (General info) 10434.8 2020 databank.worldbank.org
Population, city (General info) 6,780,000 2013 China City Statistical Yearbook. Beijing: National Statistics Bureau Press
Population, metro area (General info) 6,780,000 2013 China City Statistical Yearbook. Beijing: National Statistics Bureau Press
Population density, metropolitan area (General info) 1764.2 2013 China City Statistical Yearbook. Beijing: National Statistics Bureau Press
Modal split % public transport (General info) 32 2007 www.cities-for-mobility.net
Modal split % private transport (General info) 21 2007 www.cities-for-mobility.net
Modal split % non motorized (General info) 47 2007 www.cities-for-mobility.net
System name (System info) Guangzhou BRT
Corridors (System info) 1 2013 www.chinabrt.org
Year system commenced (System info) 2010 www.chinabrt.org
Transit agency (System info) Bus Rapid Transit Operation and Management Company 2013 www.chinabrt.org
Standard fare (US$) (System info) 0.31 2014 www.worldbrt.net
Annual fare revenue (US$ millions) (System info) 55.3 Calculated using annual demand and fare
Fare integration within the system (System info) Yes 2013 www.gz.gov.cn
Citywide fare integration (other modes) (System info) Yes 2013 www.gz.gov.cn
Integration terminals (System info) 0 2013 www.chinabrt.org
Transfer stations (System info) 3 2013 www.uncrd.or.jp
Peak load (passengers per hour per direction) (System info) 27,000 2016 CUSTReC
Daily demand (passengers per day) (System info) 850,000 2014 www.chinabrt.org
Annual demand (passengers per year) (System info) 255,000,000 2012 Calculated using daily demand and 300 working days
Capital productivity (boardings per bus per day) (System info)
Operational productivity (IPK) (System info)
Operations control center (System info) All 2013 www.chinabrt.org
Trunk lines (System info) 31 2016 CUSTReC
Feeder routes (System info) 0 2013
Depots (System info)
System length (km) (Additional Information) 22.9 2016 CUSTReC
Position of with-flow lanes (Additional Information) Median 2013
Position of counterflow lanes (Additional Information) N/A 2013
Position of bus doors (Additional Information) Right 2013
Lane material on running ways (Additional Information) Asphalt 2013 www.chinabrt.org
Lane material at stations (Additional Information) Asphalt 2013 www.chinabrt.org
Stations (Additional Information) 26 2013
Station spacing (m) (Additional Information) 880.8 2013 Calculated using system length and stations
Pre-board fare collection (Additional Information) All 2013 www.chinabrt.org
Overtaking lanes (Additional Information) All 2013 www.chinabrt.org
Station boarding level (Additional Information) Low-level platform 2013
Real time information (Additional Information) All 2013
Peak frequency (buses per hour) (Additional Information) 350 2013
Operating speed (Additional Information) 24.8 2016 CUSTReC
Total fleet (System fleet) 989 2016 CUSTReC
Fleet, standard buses (System fleet)
Average age, standard buses (System fleet)
Propulsion, standard buses (System fleet)
Fuel type, standard buses (System fleet)
Fuel economy, standard buses (System fleet)
Fleet, articulated buses (System fleet)
Average age, articulated buses (System fleet)
Propulsion, articulated buses (System fleet)
Fuel type, articulated buses (System fleet)
Fuel economy, articulated buses (System fleet)
Fleet, bi-articulated buses (System fleet) 0 2013 www.chinabrt.org
Average age, bi-articulated buses (System fleet) N/A
Propulsion, bi-articulated buses (System fleet) N/A
Fuel type, bi-articulated buses (System fleet) N/A
Fuel economy, bi-articulated buses (System fleet) N/A
Fleet, double-decker buses (System fleet) 0 2013 www.chinabrt.org
Average age, double-decker buses (System fleet) N/A
Propulsion, double-decker buses (System fleet) N/A
Fuel type, double-decker buses (System fleet) N/A
Fuel economy, double-decker buses (System fleet) N/A
Typical fuel type (System fleet) LPG 2013 www.chinabrt.org
City's diesel sulfur content (ppm) (System fleet)
Total cost per kilometer (US$ million per km) (System cost)
Planning cost (US$ million) (System cost)
Capital cost per kilometer (US$ million per km) (System cost) 4.4 2013 www.embarq.org
Infrastructure cost per kilometer (US$ million per km) (System cost)
Equipment cost (US$ million) (System cost)
Annual operational cost (US$ million) (System cost)
User rating (System image)
Brand and logo (System image) Yes 2014 www.chinabrt.org
Unique bus livery (System image) No 2014 www.chinabrt.org
Citywide annual road fatalities (System road safety)
Citywide annual injuries (System road safety)

CORRIDOR Indicators - Zhongshan Avenue

Indicator Value Date Source
Corridor Name (Corridor info) Zhongshan Avenue www.chinabrt.org
Corridor classification (Corridor info) BRT 2013 ITDP
BRT Standard (Corridor info) Silver 2013 www.itdp.org
Year corridor commenced (Corridor info) 2010 www.chinabrt.org
Corridor service (Corridor info) Conventional bus services 2013 www.chinabrt.org
Peak load, corridor (passengers per hour per direction) (Corridor info) 27,000 2016 CUSTReC
Daily demand, corridor (passengers per day) (Corridor info) 850,000 2014 www.chinabrt.org
Trunk lines, corridor (Corridor info) 31 2016 CUSTReC
Corridor length (km) (Running ways) 22.9 2016 CUSTReC
Length of segregated lanes, corridor (km) (Running ways) 22.9 2016 CUSTReC
Length of segregated counterflow lanes, corridor (km) (Running ways) 0 2013 www.chinabrt.org
Length of exclusive lanes, corridor (km) (Running ways) 0 2013 www.chinabrt.org
Mixed traffic with-flow length, corridor (km) (Running ways) 0 2013 www.chinabrt.org
Position of with-flow lanes, corridor (Running ways) Median 2013 www.chinabrt.org
Position of counterflow lanes, corridor (Running ways) N/A 2013 www.chinabrt.org
Position of bus doors, corridor (Running ways) Right 2013 www.chinabrt.org
Lane material on running ways, corridor (Running ways) Asphalt 2013 www.chinabrt.org
Lane material at stations, corridor (Running ways) Asphalt 2013 www.chinabrt.org
Grade-separated intersections, corridor (Traffic engineering) None 2013 www.chinabrt.org
Fixed signal priority (Traffic engineering) None 2013 www.chinabrt.org
Dynamic signal priority (Traffic engineering) All 2013 www.chinabrt.org
Stations, corridor (Stations) 26 2013 www.chinabrt.org
Station spacing, corridor (m) (Stations) 860 2013 Calculated using corridor length and stations
Enhanced stations (Stations) Yes 2013 www.chinabrt.org
Pre-board fare collection, corridor (Stations) All 2013 www.chinabrt.org
Overtaking lanes, corridor (Stations) All 2013 www.chinabrt.org
Station boarding level, corridor (Stations) Low-level platform 2013 www.chinabrt.org
Type of bus guidance (ITS) None 2013 www.chinabrt.org
Peak frequency, corridor (buses per hour per direction) (Travel time) 350 2013 www.chinabrt.org
Operating speed, corridor (Travel time) 24.8 2016 CUSTReC
Express services (Travel time) Yes 2013 www.chinabrt.org
Speed limit (km/h) (Travel time)
Real time information, corridor (Comfort) All 2013 www.chinabrt.org
Physically integrated feeders (Comfort) No 2013 www.chinabrt.org
Total cost per kilometer, corridor (US$ million per km) (Cost)
Planning cost, corridor (US$ million) (Cost)
Infrastructure cost per kilometer, corridor (US$ million per km) (Cost)
User rating, corridor (Quality of service)
Corridor annual fatalities (Road Safety)

Please, answer the questions below to start your download.

1

2

3

Thank you for answer.

Please, read the information below to start your download.

Thank you for filling out the questions.

If you prefer, you can download a full version of BRT DATA with worldwide data.
Download it here in Excel or CSV.

After you click the download button, your download will start automatically when the conversion process (it can take up to 30 seconds) is complete.