Global BRTData

    ABOUT
  BRT
DATA

About Global BRTData

The BRTData gathers information on bus priority systems in cities around the world. The platform is source of research for academics, journalists, students and municipal technicians, as well as provides technical background for decision making regarding public transport.

The data presented contemplate BRT systems (Bus Rapid Transit - median-aligned and segregated bus lanes, pre-board fare collection, and platform-level boarding) and bus priority systems: cities with dedicated bus lanes, but without some of the elements of a BRT. The website allows the user to know the systems and corridors of each city, compare indicators and generate graphs.

The BRTData was developed by BRT+ CoE, a Center of Excellence in BRT, and by WRI, with collaboration of the Institute for Transportation and Development Policy (ITDP). The platform is monthly updated with reliable data and verified by WRI Brasil Ross Center for Sustainable Cities.

    FIND
  YOUR
SYSTEM

BY CITY

    FIND
  YOUR
INDICATOR

SYSTEM

Report

Orlando, United States - lynx lymmo

 

Orlando has 249,562 inhabitants. 2% of total trips are made by public transport, as showed in the graph below.

 

MODAL SPLIT - ORLANDO

The city has started the system in 1997 and now counts with 3 bus priority corridors consisting of 5 kilometers and benefiting 1,588 passengers every day.

 

SYSTEM LENGTH IN RELATION TO United States

 

DAILY DEMAND IN RELATION TO United States

Some technical details about corridors are presented in the table below.

 

 

Corridor NameDaily demand, corridor (passengers per day)Corridor length (km)Stations, corridorPre-board fare collection, corridorOvertaking lanes, corridorStation boarding level, corridorOperating speed, corridor
LYNX Lymmo Orange Line 677 4.9 16
LYNX Lymmo Lime Line 75 5.1 13
LYNX Lymmo Grapefruit Line 687 5.6 17

Curiosities

SYSTEM Indicators

Indicator Value Date Source
GDP per capita (US$) (General info) 63593.4 2020 databank.worldbank.org
Population, city (General info) 249,562 2012 quickfacts.census.gov
Population, metro area (General info) 1,485,000 2011 esa.un.org
Population density, metropolitan area (General info) 5,364 2010 esa.un.org
Modal split % public transport (General info) 2 2009 www.thetransportpolitic.com
Modal split % private transport (General info) 96.5 2009 www.thetransportpolitic.com
Modal split % non motorized (General info) 1.5 2009 www.thetransportpolitic.com
System name (System info) LYNX Lymmo
Corridors (System info) 3 2022 F_LNX_Lft_LYMMO_WEB_Apr-22.pdf (golynx.com)
Year system commenced (System info) 1997 Bus Rapid Transit Planning Guide (ITDP) 2007
Transit agency (System info)
Standard fare (US$) (System info) 2.00 2023 www.golynx.com
Annual fare revenue (US$ millions) (System info) 0.9 2023 Calculated using annual demand and fare
Fare integration within the system (System info)
Citywide fare integration (other modes) (System info)
Integration terminals (System info) 2 2007 Bus Rapid Transit Planning Guide (ITDP) 2007
Transfer stations (System info)
Peak load (passengers per hour per direction) (System info)
Daily demand (passengers per day) (System info) 1,588 2021 www.golynx.com
Annual demand (passengers per year) (System info) 456,542 2021 www.golynx.com
Capital productivity (boardings per bus per day) (System info) 300 2007 Bus Rapid Transit Planning Guide (ITDP) 2007
Operational productivity (IPK) (System info)
Operations control center (System info)
Trunk lines (System info) 1
Feeder routes (System info)
Depots (System info) 1 2007 Bus Rapid Transit Planning Guide (ITDP) 2007
System length (km) (Additional Information) 5.1 2007 Bus Rapid Transit Planning Guide (ITDP) 2007
Position of with-flow lanes (Additional Information) Curbside & Separated ROW 2007 Bus Rapid Transit Planning Guide (ITDP) 2007
Position of counterflow lanes (Additional Information)
Position of bus doors (Additional Information) Right 2007 Bus Rapid Transit Planning Guide (ITDP) 2007
Lane material on running ways (Additional Information) Concrete 2007 Bus Rapid Transit Planning Guide (ITDP) 2007
Lane material at stations (Additional Information) Concrete 2007 Bus Rapid Transit Planning Guide (ITDP) 2007
Stations (Additional Information) 22 2007 Bus Rapid Transit Planning Guide (ITDP) 2007
Station spacing (m) (Additional Information) 300 2007 Bus Rapid Transit Planning Guide (ITDP) 2007
Pre-board fare collection (Additional Information)
Overtaking lanes (Additional Information)
Station boarding level (Additional Information)
Real time information (Additional Information)
Peak frequency (buses per hour) (Additional Information) 15 2007 Bus Rapid Transit Planning Guide (ITDP) 2007
Operating speed (Additional Information)
Total fleet (System fleet) 20 2021 www.golynx.com
Fleet, standard buses (System fleet)
Average age, standard buses (System fleet)
Propulsion, standard buses (System fleet)
Fuel type, standard buses (System fleet)
Fuel economy, standard buses (System fleet)
Fleet, articulated buses (System fleet)
Average age, articulated buses (System fleet)
Propulsion, articulated buses (System fleet)
Fuel type, articulated buses (System fleet)
Fuel economy, articulated buses (System fleet)
Fleet, bi-articulated buses (System fleet)
Average age, bi-articulated buses (System fleet)
Propulsion, bi-articulated buses (System fleet)
Fuel type, bi-articulated buses (System fleet)
Fuel economy, bi-articulated buses (System fleet)
Fleet, double-decker buses (System fleet)
Average age, double-decker buses (System fleet)
Propulsion, double-decker buses (System fleet)
Fuel type, double-decker buses (System fleet)
Fuel economy, double-decker buses (System fleet)
Typical fuel type (System fleet) CNG 2007 Bus Rapid Transit Planning Guide (ITDP) 2007
City's diesel sulfur content (ppm) (System fleet)
Total cost per kilometer (US$ million per km) (System cost) 4 2007 Bus Rapid Transit Planning Guide (ITDP) 2007
Planning cost (US$ million) (System cost)
Capital cost per kilometer (US$ million per km) (System cost) 6 2000 GAO, Report to Congressional Requesters: MASS TRANSIT - Bus Rapid Transit Shows Promise - at www.gao.gov
Infrastructure cost per kilometer (US$ million per km) (System cost) 4 2007 Bus Rapid Transit Planning Guide (ITDP) 2007
Equipment cost (US$ million) (System cost)
Annual operational cost (US$ million) (System cost)
User rating (System image)
Brand and logo (System image) Yes 2016 www.golynx.com
Unique bus livery (System image)
Citywide annual road fatalities (System road safety)
Citywide annual injuries (System road safety)

CORRIDOR Indicators - LYNX Lymmo Orange Line

Indicator Value Date Source
Corridor Name (Corridor info) LYNX Lymmo Orange Line 2022 2021 Annual Ridership by Link.xlsx (golynx.com)
Corridor classification (Corridor info) Not BRT 2014 ITDP
BRT Standard (Corridor info) Not BRT 2014 ITDP Preliminary assessment
Year corridor commenced (Corridor info) 1997 Bus Rapid Transit Planning Guide (ITDP) 2007
Corridor service (Corridor info)
Peak load, corridor (passengers per hour per direction) (Corridor info)
Daily demand, corridor (passengers per day) (Corridor info) 677 2021 www.golynx.com
Trunk lines, corridor (Corridor info) 1 2007 Bus Rapid Transit Planning Guide (ITDP) 2007
Corridor length (km) (Running ways) 4.9 2022 F_LNX_Lft_LYMMO_WEB_Apr-22.pdf (golynx.com)
Length of segregated lanes, corridor (km) (Running ways)
Length of segregated counterflow lanes, corridor (km) (Running ways)
Length of exclusive lanes, corridor (km) (Running ways)
Mixed traffic with-flow length, corridor (km) (Running ways)
Position of with-flow lanes, corridor (Running ways) Curbside & Separated ROW 2007 Bus Rapid Transit Planning Guide (ITDP) 2007
Position of counterflow lanes, corridor (Running ways)
Position of bus doors, corridor (Running ways) Right 2007 Bus Rapid Transit Planning Guide (ITDP) 2007
Lane material on running ways, corridor (Running ways) Concrete 2007 Bus Rapid Transit Planning Guide (ITDP) 2007
Lane material at stations, corridor (Running ways) Concrete 2007 Bus Rapid Transit Planning Guide (ITDP) 2007
Grade-separated intersections, corridor (Traffic engineering)
Fixed signal priority (Traffic engineering) Partial 2007 Bus Rapid Transit Planning Guide (ITDP) 2007
Dynamic signal priority (Traffic engineering)
Stations, corridor (Stations) 16 2022 F_LNX_Lft_LYMMO_WEB_Apr-22.pdf (golynx.com)
Station spacing, corridor (m) (Stations)
Enhanced stations (Stations)
Pre-board fare collection, corridor (Stations)
Overtaking lanes, corridor (Stations)
Station boarding level, corridor (Stations)
Type of bus guidance (ITS)
Peak frequency, corridor (buses per hour per direction) (Travel time)
Operating speed, corridor (Travel time)
Express services (Travel time)
Speed limit (km/h) (Travel time)
Real time information, corridor (Comfort)
Physically integrated feeders (Comfort)
Total cost per kilometer, corridor (US$ million per km) (Cost)
Planning cost, corridor (US$ million) (Cost)
Infrastructure cost per kilometer, corridor (US$ million per km) (Cost)
User rating, corridor (Quality of service)
Corridor annual fatalities (Road Safety)

CORRIDOR Indicators - LYNX Lymmo Lime Line

Indicator Value Date Source
Corridor Name (Corridor info) LYNX Lymmo Lime Line 2022 2021 Annual Ridership by Link.xlsx (golynx.com)
Corridor classification (Corridor info) Not BRT 2014 ITDP
BRT Standard (Corridor info) Not BRT 2014 ITDP Preliminary assessment
Year corridor commenced (Corridor info) 1997 Bus Rapid Transit Planning Guide (ITDP) 2007
Corridor service (Corridor info)
Peak load, corridor (passengers per hour per direction) (Corridor info)
Daily demand, corridor (passengers per day) (Corridor info) 75 2021 www.golynx.com
Trunk lines, corridor (Corridor info) 1 2007 Bus Rapid Transit Planning Guide (ITDP) 2007
Corridor length (km) (Running ways) 5.1 2022 F_LNX_Lft_LYMMO_WEB_Apr-22.pdf (golynx.com)
Length of segregated lanes, corridor (km) (Running ways)
Length of segregated counterflow lanes, corridor (km) (Running ways)
Length of exclusive lanes, corridor (km) (Running ways)
Mixed traffic with-flow length, corridor (km) (Running ways)
Position of with-flow lanes, corridor (Running ways) Curbside & Separated ROW 2007 Bus Rapid Transit Planning Guide (ITDP) 2007
Position of counterflow lanes, corridor (Running ways)
Position of bus doors, corridor (Running ways) Right 2007 Bus Rapid Transit Planning Guide (ITDP) 2007
Lane material on running ways, corridor (Running ways) Concrete 2007 Bus Rapid Transit Planning Guide (ITDP) 2007
Lane material at stations, corridor (Running ways) Concrete 2007 Bus Rapid Transit Planning Guide (ITDP) 2007
Grade-separated intersections, corridor (Traffic engineering)
Fixed signal priority (Traffic engineering) Partial 2007 Bus Rapid Transit Planning Guide (ITDP) 2007
Dynamic signal priority (Traffic engineering)
Stations, corridor (Stations) 13 2022 F_LNX_Lft_LYMMO_WEB_Apr-22.pdf (golynx.com)
Station spacing, corridor (m) (Stations)
Enhanced stations (Stations)
Pre-board fare collection, corridor (Stations)
Overtaking lanes, corridor (Stations)
Station boarding level, corridor (Stations)
Type of bus guidance (ITS)
Peak frequency, corridor (buses per hour per direction) (Travel time)
Operating speed, corridor (Travel time)
Express services (Travel time)
Speed limit (km/h) (Travel time)
Real time information, corridor (Comfort)
Physically integrated feeders (Comfort)
Total cost per kilometer, corridor (US$ million per km) (Cost)
Planning cost, corridor (US$ million) (Cost)
Infrastructure cost per kilometer, corridor (US$ million per km) (Cost)
User rating, corridor (Quality of service)
Corridor annual fatalities (Road Safety)

CORRIDOR Indicators - LYNX Lymmo Grapefruit Line

Indicator Value Date Source
Corridor Name (Corridor info) LYNX Lymmo Grapefruit Line 2022 2021 Annual Ridership by Link.xlsx (golynx.com)
Corridor classification (Corridor info) Not BRT 2014 ITDP
BRT Standard (Corridor info) Not BRT 2014 ITDP Preliminary assessment
Year corridor commenced (Corridor info) 1997 Bus Rapid Transit Planning Guide (ITDP) 2007
Corridor service (Corridor info)
Peak load, corridor (passengers per hour per direction) (Corridor info)
Daily demand, corridor (passengers per day) (Corridor info) 687 2021 www.golynx.com
Trunk lines, corridor (Corridor info) 1 2007 Bus Rapid Transit Planning Guide (ITDP) 2007
Corridor length (km) (Running ways) 5.6 2022 F_LNX_Lft_LYMMO_WEB_Apr-22.pdf (golynx.com)
Length of segregated lanes, corridor (km) (Running ways)
Length of segregated counterflow lanes, corridor (km) (Running ways)
Length of exclusive lanes, corridor (km) (Running ways)
Mixed traffic with-flow length, corridor (km) (Running ways)
Position of with-flow lanes, corridor (Running ways) Curbside & Separated ROW 2007 Bus Rapid Transit Planning Guide (ITDP) 2007
Position of counterflow lanes, corridor (Running ways)
Position of bus doors, corridor (Running ways) Right 2007 Bus Rapid Transit Planning Guide (ITDP) 2007
Lane material on running ways, corridor (Running ways) Concrete 2007 Bus Rapid Transit Planning Guide (ITDP) 2007
Lane material at stations, corridor (Running ways) Concrete 2007 Bus Rapid Transit Planning Guide (ITDP) 2007
Grade-separated intersections, corridor (Traffic engineering)
Fixed signal priority (Traffic engineering) Partial 2007 Bus Rapid Transit Planning Guide (ITDP) 2007
Dynamic signal priority (Traffic engineering)
Stations, corridor (Stations) 17 2022 F_LNX_Lft_LYMMO_WEB_Apr-22.pdf (golynx.com)
Station spacing, corridor (m) (Stations)
Enhanced stations (Stations)
Pre-board fare collection, corridor (Stations)
Overtaking lanes, corridor (Stations)
Station boarding level, corridor (Stations)
Type of bus guidance (ITS)
Peak frequency, corridor (buses per hour per direction) (Travel time) 15 2007 Bus Rapid Transit Planning Guide (ITDP) 2007
Operating speed, corridor (Travel time)
Express services (Travel time)
Speed limit (km/h) (Travel time)
Real time information, corridor (Comfort)
Physically integrated feeders (Comfort)
Total cost per kilometer, corridor (US$ million per km) (Cost) 4 2007 Bus Rapid Transit Planning Guide (ITDP) 2007
Planning cost, corridor (US$ million) (Cost)
Infrastructure cost per kilometer, corridor (US$ million per km) (Cost)
User rating, corridor (Quality of service)
Corridor annual fatalities (Road Safety)

Please, answer the questions below to start your download.

1

2

3

Thank you for answer.

Please, read the information below to start your download.

Thank you for filling out the questions.

If you prefer, you can download a full version of BRT DATA with worldwide data.
Download it here in Excel or CSV.

After you click the download button, your download will start automatically when the conversion process (it can take up to 30 seconds) is complete.