Global BRTData

    ABOUT
  BRT
DATA

About Global BRTData

The BRTData gathers information on bus priority systems in cities around the world. The platform is source of research for academics, journalists, students and municipal technicians, as well as provides technical background for decision making regarding public transport.

The data presented contemplate BRT systems (Bus Rapid Transit - median-aligned and segregated bus lanes, pre-board fare collection, and platform-level boarding) and bus priority systems: cities with dedicated bus lanes, but without some of the elements of a BRT. The website allows the user to know the systems and corridors of each city, compare indicators and generate graphs.

The BRTData was developed by BRT+ CoE, a Center of Excellence in BRT, and by WRI, with collaboration of the Institute for Transportation and Development Policy (ITDP). The platform is monthly updated with reliable data and verified by WRI Brasil Ross Center for Sustainable Cities.

    FIND
  YOUR
SYSTEM

BY CITY

    FIND
  YOUR
INDICATOR

SYSTEM

Report

Lagos, Nigeria - lagos brt

 

Lagos has 22,583,305 inhabitants. 71.5% of total trips are made by public transport, as showed in the graph below.

 

MODAL SPLIT - LAGOS

The city has started the system in 2008 and now counts with 1 bus priority corridors consisting of 22 kilometers and benefiting 200,000 passengers every day. The average operational speed of the system is 30 km/h.

 

SYSTEM LENGTH IN RELATION TO Nigeria

 

Some technical details about corridors are presented in the table below.

 

 

Corridor NameDaily demand, corridor (passengers per day)Corridor length (km)Stations, corridorPre-board fare collection, corridorOvertaking lanes, corridorStation boarding level, corridorOperating speed, corridor
Lagos BRT 200,000 22 28 30

Curiosities

SYSTEM Indicators

Indicator Value Date Source
GDP per capita (US$) (General info) 2097.1 2020 databank.worldbank.org
Population, city (General info) 22,583,305 2014 (Projection based on population growth rate of 3.2% from Census 2006. Supplied by Lagos Bureau of Statistics) www.lagosstate.gov.ng
Population, metro area (General info) 22,583,305 2014 (Projection based on population growth rate of 3.2% from Census 2006. Supplied by Lagos Bureau of Statistics) www.lagosstate.gov.ng
Population density, metropolitan area (General info) 6,515 2022 UITP
Modal split % public transport (General info) 71.5 2010 staging.wider.unu.edu
Modal split % private transport (General info) 15 2010 staging.wider.unu.edu
Modal split % non motorized (General info) 13.5 2010 staging.wider.unu.edu
System name (System info) Lagos BRT
Corridors (System info) 1 2011 Moberola, Dayo, LAMATA, siteresources.worldbank.org
Year system commenced (System info) 2008 Viva 2010 - www.uncrd.or.jp and Trans-Africa Consortium 2010 and www.itdp.org
Transit agency (System info) Lagos Metropolitan Area Transport Authority 2015 www.lamata-ng.com
Standard fare (US$) (System info) 0.89 2023 www.withinnigeria.com
Annual fare revenue (US$ millions) (System info) 53.4 2023 Viva 2010 - www.uncrd.or.jp and Trans-Africa Consortium 2010 and www.itdp.org
Fare integration within the system (System info) Yes 2013 businessdayonline.com
Citywide fare integration (other modes) (System info)
Integration terminals (System info) 3 2010 Viva 2010 - www.uncrd.or.jp and Trans-Africa Consortium 2010 and www.itdp.org
Transfer stations (System info)
Peak load (passengers per hour per direction) (System info)
Daily demand (passengers per day) (System info) 200,000 2011 Viva 2010 - www.uncrd.or.jp and Trans-Africa Consortium 2010 and www.itdp.org
Annual demand (passengers per year) (System info) 60,000,000 2011 Calculated using daily demand and 300 working days
Capital productivity (boardings per bus per day) (System info) 800 2015 www.lamata-ng.com
Operational productivity (IPK) (System info)
Operations control center (System info)
Trunk lines (System info)
Feeder routes (System info)
Depots (System info) 1 2010 Viva 2010 - www.uncrd.or.jp and Trans-Africa Consortium 2010 and www.itdp.org
System length (km) (Additional Information) 22 2015 www.lamata-ng.com
Position of with-flow lanes (Additional Information)
Position of counterflow lanes (Additional Information)
Position of bus doors (Additional Information) Right 2015 www.lamata-ng.com
Lane material on running ways (Additional Information)
Lane material at stations (Additional Information)
Stations (Additional Information) 28 2015 www.lamata-ng.com
Station spacing (m) (Additional Information) 800 2015 Calculated using system length and stations
Pre-board fare collection (Additional Information)
Overtaking lanes (Additional Information)
Station boarding level (Additional Information)
Real time information (Additional Information)
Peak frequency (buses per hour) (Additional Information)
Operating speed (Additional Information) 30 2015 www.lamata-ng.com
Total fleet (System fleet) 220 2011 Moberola, Dayo, LAMATA, siteresources.worldbank.org
Fleet, standard buses (System fleet)
Average age, standard buses (System fleet)
Propulsion, standard buses (System fleet)
Fuel type, standard buses (System fleet)
Fuel economy, standard buses (System fleet)
Fleet, articulated buses (System fleet)
Average age, articulated buses (System fleet)
Propulsion, articulated buses (System fleet)
Fuel type, articulated buses (System fleet)
Fuel economy, articulated buses (System fleet)
Fleet, bi-articulated buses (System fleet)
Average age, bi-articulated buses (System fleet)
Propulsion, bi-articulated buses (System fleet)
Fuel type, bi-articulated buses (System fleet)
Fuel economy, bi-articulated buses (System fleet)
Fleet, double-decker buses (System fleet)
Average age, double-decker buses (System fleet)
Propulsion, double-decker buses (System fleet)
Fuel type, double-decker buses (System fleet)
Fuel economy, double-decker buses (System fleet)
Typical fuel type (System fleet)
City's diesel sulfur content (ppm) (System fleet)
Total cost per kilometer (US$ million per km) (System cost) 1.7 2010 Viva 2010 - www.uncrd.or.jp and Trans-Africa Consortium 2010 and www.itdp.org
Planning cost (US$ million) (System cost)
Capital cost per kilometer (US$ million per km) (System cost)
Infrastructure cost per kilometer (US$ million per km) (System cost) 1.7 2010 Viva 2010 - www.uncrd.or.jp and Trans-Africa Consortium 2010 and www.itdp.org
Equipment cost (US$ million) (System cost)
Annual operational cost (US$ million) (System cost)
User rating (System image)
Brand and logo (System image)
Unique bus livery (System image)
Citywide annual road fatalities (System road safety)
Citywide annual injuries (System road safety)

CORRIDOR Indicators - Lagos BRT

Indicator Value Date Source
Corridor Name (Corridor info) Lagos BRT Viva 2010 - www.uncrd.or.jp and Trans-Africa Consortium 2010 and www.itdp.org
Corridor classification (Corridor info)
BRT Standard (Corridor info) Not BRT 2016 ITDP
Year corridor commenced (Corridor info) 2008 Viva 2010 - www.uncrd.or.jp and Trans-Africa Consortium 2010 and www.itdp.org
Corridor service (Corridor info)
Peak load, corridor (passengers per hour per direction) (Corridor info)
Daily demand, corridor (passengers per day) (Corridor info) 200,000 2011 Viva 2010 - www.uncrd.or.jp and Trans-Africa Consortium 2010 and www.itdp.org
Trunk lines, corridor (Corridor info)
Corridor length (km) (Running ways) 22 2015 www.lamata-ng.com
Length of segregated lanes, corridor (km) (Running ways) 14.3 2015 www.lamata-ng.com
Length of segregated counterflow lanes, corridor (km) (Running ways)
Length of exclusive lanes, corridor (km) (Running ways)
Mixed traffic with-flow length, corridor (km) (Running ways)
Position of with-flow lanes, corridor (Running ways)
Position of counterflow lanes, corridor (Running ways)
Position of bus doors, corridor (Running ways) Right 2015 www.lamata-ng.com
Lane material on running ways, corridor (Running ways)
Lane material at stations, corridor (Running ways)
Grade-separated intersections, corridor (Traffic engineering)
Fixed signal priority (Traffic engineering)
Dynamic signal priority (Traffic engineering)
Stations, corridor (Stations) 28 2015 www.lamata-ng.com
Station spacing, corridor (m) (Stations) 800 2015 Calculated using system length and stations
Enhanced stations (Stations) Yes 2015 www.lamata-ng.com
Pre-board fare collection, corridor (Stations)
Overtaking lanes, corridor (Stations)
Station boarding level, corridor (Stations)
Type of bus guidance (ITS)
Peak frequency, corridor (buses per hour per direction) (Travel time)
Operating speed, corridor (Travel time) 30 2015 www.lamata-ng.com
Express services (Travel time)
Speed limit (km/h) (Travel time)
Real time information, corridor (Comfort)
Physically integrated feeders (Comfort)
Total cost per kilometer, corridor (US$ million per km) (Cost) 1.7 2010 Viva 2010 - www.uncrd.or.jp and Trans-Africa Consortium 2010 and www.itdp.org
Planning cost, corridor (US$ million) (Cost)
Infrastructure cost per kilometer, corridor (US$ million per km) (Cost) 1.7 2010 Viva 2010 - www.uncrd.or.jp and Trans-Africa Consortium 2010 and www.itdp.org
User rating, corridor (Quality of service)
Corridor annual fatalities (Road Safety)

Please, answer the questions below to start your download.

1

2

3

Thank you for answer.

Please, read the information below to start your download.

Thank you for filling out the questions.

If you prefer, you can download a full version of BRT DATA with worldwide data.
Download it here in Excel or CSV.

After you click the download button, your download will start automatically when the conversion process (it can take up to 30 seconds) is complete.